Welding Inspection Report
No.WIR-2026-0018
1. General Information
| Inspection date | 7/14/2026 | Address | 1200 Oak Avenue, Building B, Floor 2, Chicago, IL 60601 |
| Basis for inspection | AWS D1.1 code compliance |
2. Object of Inspection
| Object type | not filled in | Object name | Steel Frame Connection W12 |
| Technical condition | not filled in |
3. Main Parameters
| Weld Type | Fillet | Weld Size | 8 mm |
| Visual Inspection Result | Pass | NDT Method | Ultrasonic |
| NDT Result | Acceptable |
4. Inspection Conditions
5. Defects
| No. | Damage description | Photos |
|---|---|---|
| 1 | - 3 | not filled in |
6. Additional Information
| Identification was carried out | Welder qualification verified. |
| There are remarks | Visual inspection passed for all welds. |
7. Abbreviations and Symbols
8. Inspection Participants
| No. | Full name | Position / status | Comment |
|---|---|---|---|
| 1 | Robert Turner | Welding Inspector | Performed visual inspection |
| 2 | Emily Davis | Structural Engineer | Reviewed NDT results |