Report

Waterproofing Inspection Report

Create a waterproofing inspection report online. Verify that waterproofing is correctly installed before covering, with thickness measurements, adhesion tests, and photo evidence.

Start with this template

View All Templates

The full inspection cycle — in one service

Take photos of the object in the mobile app, complete the inspection report from the template, and download the finished photo report as Word or PDF.

1

Mobile Photo Documentation App

Capture waterproofing photos on-site with the mobile app, annotate test locations, and sync them directly to your report.

Mobile App
2

Inspection report

Complete the document from this template: sections, fields, photo documentation, and signatures.

3

Photo Report Generator

Use the photo report generator to create a visual record of surface preparation, membrane application, thickness measurement, and any defects.

Create Photo Report

Report

Document Preview

Review the structure, sections, and fields before proceeding to fill out the document.

Waterproofing Inspection Report

No.WIR-2026-0055

1. General Information

The inspection was conducted in accordance with applicable standards and regulations for foundation assessment.

Inspection date7/14/2026 AddressHarbour View Apartments, Basement Level, 15 Marine Drive, Southampton SO14 3TY
Basis for inspectionContract No. HV-2025-112
Expert Oliver Harris , Waterproofing Specialist

The general condition of the foundations was evaluated and is summarized below.

2. Object of Inspection

The object of inspection is the foundation system of the building, including all load-bearing elements.

Object typeWaterproofing System Object nameBasement wall liquid applied membrane
Technical conditionnot filled in

The foundation system was identified and its key characteristics are listed.

3. Main Parameters

Main parameters were determined based on design documentation and field measurements.

Waterproofing TypeLiquid Applied Membrane ManufacturerSika
Application MethodRoller Surface PreparationConcrete surface cleaned, primed with Sika Primer
Thickness Measurement1.8 Adhesion Test Result1.2

The main parameters of the foundations are presented in the table below.

4. Inspection Conditions

The condition of the foundations was assessed through visual inspection and non-destructive testing methods.

Inspection conditions are not selected.

The overall condition of the foundations is described in the following section.

5. Defects

List any defects observed in the waterproofing.

No.Damage descriptionPhotos
1-not filled in

6. Additional Information

Provide overall assessment and conclusion.

Identification was carried outWaterproofing system: Liquid applied membrane on basement walls
There are remarksThickness measurements within spec. Adhesion test passed. Minor surface irregularity noted at corner joint. Overall satisfactory.

7. Inspection Participants

List the waterproofing specialist, general contractor, and inspector.

No.Full namePosition / statusComment
1Oliver HarrisWaterproofing SpecialistInstalled and inspected
2Liam ScottGeneral ContractorWitnessed inspection
3Sophie AdamsInspectorVerified compliance

Signatures

Capture signatures of all parties.

______________________________
Oliver Harris, Waterproofing Specialist
______________________________
Oliver Harris
______________________________
Liam Scott
______________________________
Sophie Adams

Report

Purpose and Procedure for Drafting the Document

What Is a Waterproofing Inspection Report?

A waterproofing inspection report documents the inspection of waterproofing systems to ensure they are correctly installed and meet specifications before being covered by subsequent layers.

Why Use This Template?

This template provides a comprehensive framework for recording waterproofing details, inspection results, thickness measurements, adhesion tests, and defects. It helps ensure quality and compliance.

Key Features

The report includes sections for project information, waterproofing details, inspection results (thickness, adhesion, defects), conclusion, and signatures from the specialist, contractor, and inspector.

Construction Quality Control

Waterproofing specialists and inspectors use this report to verify that the waterproofing system is installed correctly before covering, preventing future water ingress.

Regulatory Compliance

Building codes often require documented inspection of waterproofing. This report provides evidence of compliance with specifications.

Warranty Documentation

Manufacturers may require a signed inspection report to validate the warranty on waterproofing materials.

Project Handover

The report serves as a formal record that waterproofing works have been inspected and approved, which is often required for project handover.

  1. 1

    Open the Template

    Open the waterproofing inspection report template in the online editor.

  2. 2

    Enter Project and Waterproofing Details

    Record project information, waterproofing type, manufacturer, application method, and surface preparation.

  3. 3

    Perform and Record Tests

    Measure thickness, perform adhesion tests, and record results. Document any defects or observations.

  4. 4

    Assess and Conclude

    Provide an overall assessment and conclusion. Add signatures from the waterproofing specialist, general contractor, and inspector.

  5. 5

    Export the Report

    Download the completed report as a PDF or share it with project stakeholders.

Photo Report Generator

Use the photo report generator to create a visual record of surface preparation, membrane application, thickness measurement, and any defects.

Create Photo Report

Mobile Photo Documentation App

Capture waterproofing photos on-site with the mobile app, annotate test locations, and sync them directly to your report.

Mobile App

Document Sections

Click a section to jump to it in the sample document.

General Information

The inspection was conducted in accordance with applicable standards and regulations for foundation assessment.

Object of Inspection

The object of inspection is the foundation system of the building, including all load-bearing elements.

Main Parameters

Main parameters were determined based on design documentation and field measurements.

Inspection Conditions

The condition of the foundations was assessed through visual inspection and non-destructive testing methods.

Defects

List any defects observed in the waterproofing.

Additional Information

Provide overall assessment and conclusion.

Inspection Participants

List the waterproofing specialist, general contractor, and inspector.

Signatures

Capture signatures of all parties.

Document Fields and Columns

General Information

Inspection date
Date of the waterproofing inspection.
Address
Project location address.
Basis for inspection
Contract number.
Expert
Name of the waterproofing specialist.

Object of Inspection

Object type
Type of waterproofing system.
Object name
System designation.
Technical condition
Overall condition.

Defects

No.
Sequential number.
Element
Component or area.
Defect
Description of the defect.
Localization
Specific location.
Damage description
Detailed notes.
Photos
Photo evidence.

Inspection Participants

No.
Sequential number.
Full name
Full name.
Position / status
Role.
Comment
Remarks.

Frequently Asked Questions about Photo Reports and Photo Tables

What tests are typically performed during a waterproofing inspection?

Common tests include thickness measurement of the applied membrane, adhesion (pull-off) tests, and visual inspection for defects such as blisters, tears, or inadequate coverage.

Who performs the waterproofing inspection?

The inspection is typically performed by a waterproofing specialist or an independent inspector. The report is signed by the specialist, general contractor, and inspector.

Can I add photos to the report?

Yes, the template includes a photo collection field for attaching photos of surface preparation, membrane application, thickness measurement, and any defects.

What happens if the waterproofing fails inspection?

If the waterproofing is unsatisfactory, the report documents the defects and the works must be corrected and re-inspected before covering.

Is this template suitable for all types of waterproofing?

Yes, the template supports various waterproofing types including liquid applied membranes, sheet membranes, cementitious coatings, and bentonite waterproofing.

Create Your Document Online

Enter inspection details and generate a ready-to-download document.