Mobile Photo Documentation App
Capture photos of screens, gates, and structures on site with the mobile app, then import them into your water intake inspection report.
Mobile AppReport
Assess the condition of water intake screens, gates, and structures with this comprehensive online template. Document defects, observations, and recommendations.
Start your water intake inspection report now
Take photos of the object in the mobile app, complete the inspection report from the template, and download the finished photo report as Word or PDF.
Capture photos of screens, gates, and structures on site with the mobile app, then import them into your water intake inspection report.
Mobile AppComplete the document from this template: sections, fields, photo documentation, and signatures.
Create a professional photo annex of intake components and defects using the photo report generator, enhancing your inspection report.
Create Photo ReportReport
Review the structure, sections, and fields before proceeding to fill out the document.
No.WI-2026-07-14-001
The general information about the inspection, including the date, location, and inspection team, is provided below.
| Inspection date | 7/14/2026 | Address | River intake, 500 River Road, Springfield, IL 62701 |
| Basis for inspection | Quarterly inspection |
The inspection was conducted in accordance with the approved schedule and methodology.
The water intake facilities under inspection include the intake structure, pumping station, and associated pipelines.
| Object name | River Intake Structure R-1 | Technical condition | not filled in |
The inspected facilities are identified and their main characteristics are described.
The main parameters of the water intake facilities, such as capacity, dimensions, and design specifications, were verified against the design documentation.
| Structure Type | River Intake | Component Condition | Fair |
The measured parameters are within the permissible tolerances specified in the design.
List defects and observations for screens, gates, and structural components with photos.
| No. | Damage description | Photos |
|---|---|---|
| 1 | - | not filled in |
| 2 | - | not filled in |
Provide overall condition rating and recommendations.
| Identification was carried out | River Intake Structure R-1 |
| There are remarks | Screen 1 has debris accumulation; gate G-1 operates stiffly. |
List the inspector and water resource manager involved.
| No. | Full name | Position / status | Comment |
|---|---|---|---|
| 1 | Emily Carter | Inspector | Conducted inspection |
| 2 | Michael Brown | Water Resource Manager | Reviewed report |
Capture signatures of the inspector and water resource manager.
Report
This report documents the inspection of water intake structures, including screens, gates, and structural components. It captures condition ratings, defects, observations, and photo evidence to support maintenance and repair decisions.
The template provides a structured format for inspecting each component of the intake facility. It includes repeatable sections for screens and gates, ensuring thorough documentation.
The report includes inspection identification, intake structure details, screen inspection, gate inspection, structural inspection, findings and recommendations, photos, and signatures.
Use this report for routine periodic inspections of water intake structures to monitor condition and plan maintenance.
After a flood event, inspect the intake for debris accumulation, structural damage, and screen or gate issues.
Track the condition of intake components over time to prioritize repairs and replacements.
Demonstrate compliance with water safety regulations by maintaining inspection records.
When operational issues arise (e.g., reduced flow), use this report to inspect screens and gates for blockages or defects.
The report may serve as evidence in insurance claims or legal matters related to intake structure failures.
Visit the intake structure and prepare for inspection. Ensure safety and access to all components.
Inspect each screen and gate for condition, defects, and debris accumulation. Record findings in the template.
Assess the structural condition of the intake, including concrete, steel, and other materials.
Document all findings, take photos, and note any observations. Use the template to organize data.
Compile the report with overall condition assessment and recommendations. Obtain signatures from the inspector and water resource manager.
Create a professional photo annex of intake components and defects using the photo report generator, enhancing your inspection report.
Create Photo ReportCapture photos of screens, gates, and structures on site with the mobile app, then import them into your water intake inspection report.
Mobile AppClick a section to jump to it in the sample document.
The general information about the inspection, including the date, location, and inspection team, is provided below.
The water intake facilities under inspection include the intake structure, pumping station, and associated pipelines.
The main parameters of the water intake facilities, such as capacity, dimensions, and design specifications, were verified against the design documentation.
List defects and observations for screens, gates, and structural components with photos.
Provide overall condition rating and recommendations.
List the inspector and water resource manager involved.
Capture signatures of the inspector and water resource manager.
The report covers intake screens, gates, and the overall structure. Each screen and gate can be inspected individually with condition ratings and defect records.
Common defects include debris accumulation, damaged screens, stuck gates, and structural damage such as cracks or corrosion.
Yes, the template includes a photo section for overall structure photos and defect close-ups. Photos are essential for documenting conditions.
The report is typically signed by the inspector and the water resource manager. Signatures confirm the findings and recommendations.
Yes, the template is designed for various intake types, including river intakes and reservoir intakes. You can specify the structure type and customize as needed.
Enter inspection details and generate a ready-to-download document.