Mobile Photo Documentation App
Use the mobile app to capture photos of measurement points on site, link them to data entries, and sync directly to your report.
Mobile AppReport
Create a professional track geometry report online. Record gauge, alignment, profile, twist, and cross-level measurements at each measurement point.
Start with this template
Take photos of the object in the mobile app, complete the inspection report from the template, and download the finished photo report as Word or PDF.
Use the mobile app to capture photos of measurement points on site, link them to data entries, and sync directly to your report.
Mobile AppComplete the document from this template: sections, fields, photo documentation, and signatures.
The photo report generator helps you create a visual annex with images of measurement points and track conditions, organized for easy reference.
Create Photo ReportReport
Review the structure, sections, and fields before proceeding to fill out the document.
No.TGR-2026-0056
The general condition of the railway track section was evaluated in accordance with standard inspection procedures.
| Inspection date | 7/14/2026 | Address | Section 12, Main Line, km 45+200 to km 45+800 |
The overall condition of the track is deemed satisfactory with no immediate safety concerns.
The object of inspection is the railway track section located between kilometer markers 45 and 50 on the main line.
| Object name | Main Line Section 12 | Technical condition | not filled in |
The track section was identified and its boundaries confirmed.
Main parameters such as gauge, alignment, and superelevation were measured using calibrated instruments.
| Gauge | 1435 | Alignment | 5 |
| Profile | 4 | Twist | 3 |
| Cross Level | 2 |
All main parameters are within the permissible tolerances specified by the railway standards.
List any track defects found, including location, type, and photos.
| No. | Damage description | Photos |
|---|---|---|
| 1 | - | not filled in |
Provide overall assessment and recommendations based on measurements.
| Identification was carried out | Track section ID: ML-45 |
| There are remarks | Minor deviations in alignment at point 45+500. |
List the inspector and reviewer involved.
| No. | Full name | Position / status | Comment |
|---|---|---|---|
| 1 | David Kim | Track Geometry Specialist | Performed measurements. |
| 2 | Linda Park | Track Maintenance Supervisor | Reviewed results. |
Signatures of the inspector and reviewer to confirm the report.
Report
A track geometry report is a technical document used to record measurements of track parameters such as gauge, alignment, profile, twist, and cross-level. It is essential for assessing track condition and planning maintenance.
An online report streamlines data entry, ensures consistent formatting, and allows easy attachment of photos and files. It facilitates quick generation of professional reports for analysis and record-keeping.
The report includes report identification, repeatable geometry measurements (point, gauge, alignment, profile, twist, cross-level), conclusions, attachments, and signatures.
Track inspectors use this report to document geometry measurements during routine inspections. It helps identify deviations from tolerance limits.
After extreme weather or incidents, this report records track geometry to assess any changes or damage. It supports decision-making for repairs.
The measurement data helps prioritize tamping, lining, and other maintenance activities. Trends over time can indicate deterioration.
Rail authorities may require geometry reports as part of safety compliance. Accurate records demonstrate adherence to standards.
Identify the track section to be measured and gather measurement equipment. Review previous reports for baseline data.
Take measurements at each designated point using appropriate tools. Record gauge, alignment, profile, twist, and cross-level.
Enter measurement data into the online template. Attach photos of measurement points or any anomalies.
Generate the final report with an overall assessment and recommendations. Sign digitally and share with relevant teams.
The photo report generator helps you create a visual annex with images of measurement points and track conditions, organized for easy reference.
Create Photo ReportUse the mobile app to capture photos of measurement points on site, link them to data entries, and sync directly to your report.
Mobile AppClick a section to jump to it in the sample document.
The general condition of the railway track section was evaluated in accordance with standard inspection procedures.
The object of inspection is the railway track section located between kilometer markers 45 and 50 on the main line.
Main parameters such as gauge, alignment, and superelevation were measured using calibrated instruments.
List any track defects found, including location, type, and photos.
Provide overall assessment and recommendations based on measurements.
List the inspector and reviewer involved.
Signatures of the inspector and reviewer to confirm the report.
The report records gauge, alignment, profile, twist, and cross-level at each measurement point. Twist and cross-level are optional but recommended for comprehensive assessment.
The report includes a photo collection field in the attachments section. You can upload photos of measurement points or any track geometry issues.
Yes, the measurements section is repeatable, allowing you to add as many measurement points as needed. You can specify the chainage or reference point for each.
The report provides a detailed record of track geometry measurements and can be used as supporting documentation for regulatory compliance. Specific requirements may vary.
Measurements are recorded in millimeters (mm) by default. You can adjust the unit if needed.
Enter inspection details and generate a ready-to-download document.