Thermal Power Plant Inspection Report
No.TPP-2026-003
1. General Information
| Inspection date | 7/14/2026 | Address | Unit 2, Coal Creek Power Station, 5000 Power Plant Rd, Centralia, WA 98531 |
| Basis for inspection | Annual outage inspection |
2. Object of Inspection
| Object name | Coal Creek Power Station Unit 2 | Technical condition | not filled in |
3. Plant Parameters
| Rated Capacity | 600 | Steam Pressure | 165 |
| Steam Temperature | 540 |
4. Inspection Conditions
5. Component Findings
| No. | Damage description | Photos |
|---|---|---|
| 1 | - | not filled in |
| 2 | - | not filled in |
6. Overall Assessment
| Identification was carried out | Coal Creek Power Station Unit 2 |
| There are remarks | Overall condition fair. Boiler tube leaks and turbine blade erosion identified. Recommend repairs before next operating cycle. |
7. Abbreviations and Symbols
8. Inspection Participants
| No. | Full name | Position / status | Comment |
|---|---|---|---|
| 1 | Robert Johnson | Inspector | Lead inspector |
| 2 | Patricia Lee | Plant Manager | Reviewed findings |
| 3 | Thomas Brown | Maintenance Team Lead | Assisted with inspections |