Technical Condition Report
No.TCR-2026-033
1. General Information
| Inspection date | 7/14/2026 | Address | 55 Bridge Street, London SE1 9GF |
| Basis for inspection | Routine condition assessment for asset management |
2. Object of Inspection
| Object type | not filled in | Object name | London Bridge South Section |
| Technical condition | not filled in | Year Built | 1/1/1972 |
| Start of Operation | 1/1/1973 |
3. Asset Parameters
| Design Life | 120 | Year Built | 1972 |
| Overall Length | 320 |
4. Inspection Conditions
5. Findings
| No. | Damage description | Photos |
|---|---|---|
| 1 | - | not filled in |
| 2 | - | not filled in |
6. Additional Information
| Identification was carried out | Asset: London Bridge (south section), Year built: 1972, Design life: 120 years |
| There are remarks | Overall condition rated Fair. Remaining life estimated at 40 years with regular maintenance. |
7. Inspection Participants
| No. | Full name | Position / status | Comment |
|---|---|---|---|
| 1 | Michael Brown | Structural Engineer | Lead assessor |
| 2 | Anna Green | Facility Manager | Asset owner representative |