Structural Integrity Report
No.SIR-2026-017
1. General Information
| Inspection date | 7/14/2026 | Address | 500 Industrial Parkway, Warehouse 3, Detroit, MI |
| Basis for inspection | Periodic structural assessment |
2. Object of Inspection
| Object type | not filled in | Object name | Warehouse 3 |
| Technical condition | not filled in | Release date | 1/1/2005 |
3. Structure Details
| Structure Type | Steel frame warehouse | Year Built | 2005 |
| Design Code | IBC 2003 |
4. Inspection Conditions
5. Findings
| No. | Damage description | Photos |
|---|---|---|
| 1 | - 10 | not filled in |
| 2 | - | not filled in |
6. Additional Information
| Identification was carried out | Structure ID: WH-3-DET |
| There are remarks | Structure is safe for continued use; minor corrosion on steel columns. |
7. Inspection Participants
| No. | Full name | Position / status | Comment |
|---|---|---|---|
| 1 | Dr. Alan Foster | Structural Engineer | Lead engineer |
| 2 | Gary Moore | Facility Manager | Client representative |