Verify compliance of sprinkler systems with NFPA 25. Record component conditions, test results, defects, and photo evidence in a structured online report.
Start with this template
Take photos of the object in the mobile app, complete the inspection report from the template, and download the finished photo report as Word or PDF.
Capture inspection photos and data on-site with the mobile app. Sync everything to the report template for a seamless workflow.
Mobile AppComplete the document from this template: sections, fields, photo documentation, and signatures.
Use the photo report generator to attach photos of sprinkler heads, piping, and water supply connections. Visual evidence supports the inspection findings.
Create Photo ReportReport
Review the structure, sections, and fields before proceeding to fill out the document.
No.SSIR-2026-0044
The inspection was conducted in accordance with applicable standards and regulations for engineering network closure.
| Inspection date | 7/14/2026 | Address | Eastside Warehouse, 50 Industrial Boulevard, Detroit, MI 48201 |
The overall condition of the networks was assessed and documented.
The object of inspection is the engineering networks scheduled for closure, including their components and associated infrastructure.
| Object name | Building A Sprinkler System | Technical condition | not filled in |
The networks were identified and their location and extent confirmed.
Main parameters such as dimensions, capacity, and material specifications were verified against design documentation.
| System Type | Wet Pipe | Water Supply Source | City Main |
| Date Installed | 10/1/2018 | Last Service Date | 6/15/2025 |
No deviations from the design parameters were found.
Additional parameters including operational characteristics and safety features were reviewed.
| Water Flow Test: Pass | Alarm Test: Pass |
| Valve Operation Test: Pass |
All additional parameters met the required criteria.
List defects found on components, including type, location, severity, and description.
| No. | Damage description | Photos |
|---|---|---|
| 1 | - | not filled in |
Provide overall conclusions and recommendations.
| Identification was carried out | Wet pipe sprinkler system, building A |
| There are remarks | System operational. One sprinkler head shows minor corrosion. Control valves open. Water flow test passed. |
List the participants: fire protection inspector and building owner.
| No. | Full name | Position / status | Comment |
|---|---|---|---|
| 1 | Maria Garcia | Fire Protection Inspector | Performed inspection |
| 2 | John Smith | Building Owner | Received report |
Capture signatures of the inspector and building owner.
Report
A sprinkler system inspection report documents the inspection of a fire sprinkler system to verify compliance with NFPA 25. It includes system information, component conditions, test results, defects, observations, and photos.
Fire protection inspectors, building owners, and facility managers use this report to document inspections and identify deficiencies. It supports compliance with fire safety regulations.
The report includes sections for inspection details, system information, components inspected, test results, defects, observations, photos, and signatures. Each section captures essential data for a complete inspection record.
NFPA 25 requires annual inspections of sprinkler systems. This template helps standardize the inspection process and document compliance.
Before a building is occupied, the sprinkler system must be inspected to ensure it is installed correctly and functional. This report documents the inspection results.
After repairs or modifications, an inspection report verifies that the system is operating correctly. It documents the condition of repaired components.
Insurance companies and fire authorities may require documented inspections. This report provides evidence of compliance and due diligence.
Check sprinkler heads for corrosion, paint overspray, obstructions, and proper clearance. Record the condition of each head.
Verify that all control valves are in the correct position (open) and are properly sealed or locked. Test valve operation if required.
Conduct a water flow test to ensure adequate flow and pressure. Record test results and any alarms that are activated.
Inspect piping for leaks, corrosion, and proper supports. Note any issues and take photos as evidence.
Use the photo report generator to attach photos of sprinkler heads, piping, and water supply connections. Visual evidence supports the inspection findings.
Create Photo ReportCapture inspection photos and data on-site with the mobile app. Sync everything to the report template for a seamless workflow.
Mobile AppClick a section to jump to it in the sample document.
The inspection was conducted in accordance with applicable standards and regulations for engineering network closure.
The object of inspection is the engineering networks scheduled for closure, including their components and associated infrastructure.
Main parameters such as dimensions, capacity, and material specifications were verified against design documentation.
Additional parameters including operational characteristics and safety features were reviewed.
List defects found on components, including type, location, severity, and description.
Provide overall conclusions and recommendations.
List the participants: fire protection inspector and building owner.
Capture signatures of the inspector and building owner.
It is a document that records the inspection of a fire sprinkler system to verify compliance with NFPA 25. It includes system information, component conditions, test results, defects, and photos.
The report is based on NFPA 25, Standard for the Inspection, Testing, and Maintenance of Water-Based Fire Protection Systems. It can be adapted to other standards as needed.
Components include sprinkler heads, control valves, pipes, water flow switches, and water supply connections. The inspection covers all major parts of the system.
Tests include water flow tests, alarm tests, and valve operation tests. Each test verifies that the system functions correctly.
The fire protection inspector who performed the inspection and the building owner or representative sign the report. Signatures confirm the inspection and acknowledge the findings.