Spillway Inspection Report
No.SW-2026-0092
1. General Information
| Inspection date | 7/14/2026 | Address | Shasta Dam, Shasta Lake, CA 96019 |
| Basis for inspection | Five-year spillway structural inspection |
2. Object of Inspection
| Object type | not filled in | Object name | Shasta Dam Spillway |
| Technical condition | not filled in |
3. Main Parameters
| Spillway type | Chute spillway | Design discharge | 8500 |
| Number of gates | 3 |
4. Inspection Conditions
5. Findings
| No. | Damage description | Photos |
|---|---|---|
| 1 | - | not filled in |
| 2 | - | not filled in |
6. Additional Information
| Identification was carried out | Spillway components identified by design drawings and field markers |
| There are remarks | Chute concrete in good condition. Stilling basin shows minor erosion. Training walls have hairline cracks. Overall condition good. |
7. Inspection Participants
| No. | Full name | Position / status | Comment |
|---|---|---|---|
| 1 | Dr. Robert Kim | Structural Engineer | Lead inspector |
| 2 | Dr. Lisa Nguyen | Hydraulic Engineer | Hydraulic assessment |