Mobile Photo Documentation App
Capture snag photos on-site using the mobile app and instantly attach them to your snagging list for accurate documentation.
Mobile AppRecord
Use this online template to document snag items identified during construction inspections. Track defects, assign severity, and manage resolution with photo evidence.
Start your snagging list now
Take photos of the object in the mobile app, complete the inspection report from the template, and download the finished photo report as Word or PDF.
Capture snag photos on-site using the mobile app and instantly attach them to your snagging list for accurate documentation.
Mobile AppComplete the document from this template: sections, fields, photo documentation, and signatures.
Use the photo report generator to create a comprehensive snagging list with photo evidence for each defect, making it easy to communicate issues to the contractor.
Create Photo ReportRecord
Review the structure, sections, and fields before proceeding to fill out the document.
No.SNG-2026-0038
The general information about the inspection, including the date, location, and purpose, is provided below.
| Inspection date | 7/14/2026 | Address | 88 Oak Avenue, New Development Phase 2, Austin, TX 78701 |
| Basis for inspection | Pre-handover inspection of residential units |
The inspection was carried out in full compliance with the approved schedule and scope.
The building under inspection is identified by its address, purpose, and construction characteristics.
| Object type | Building | Object name | Oak Avenue Residences - Building A |
| Technical condition | not filled in |
The identification data of the building were verified against the technical passport and found to be consistent.
The technical condition of the building structures and elements was evaluated through visual inspection and non-destructive testing methods.
The overall condition of the building is assessed as satisfactory, with no critical defects observed.
List all snag items with element, defect type, location, description, and photos.
| No. | Damage description | Photos |
|---|---|---|
| 1 | - | not filled in |
| 2 | - | not filled in |
| 3 | - | not filled in |
Provide overall comments and status of snag resolution.
| Identification was carried out | Project: Oak Avenue Residences, Units 101-104 |
| There are remarks | All snags documented; contractor to rectify before handover. |
List the inspector and contractor.
| No. | Full name | Position / status | Comment |
|---|---|---|---|
| 1 | Michael Torres | Construction Inspector | Lead inspector |
| 2 | David Chen | Contractor Representative | Accompanied inspection |
The signatures of the inspection participants confirm the accuracy of the recorded data and the conclusions drawn.
All parties involved have signed the inspection record, indicating their agreement with the findings.
Record
A snagging list is a document used to record minor defects or incomplete works identified during a final inspection of a construction project. It helps ensure that all issues are corrected before handover.
Inspectors, contractors, and project managers use snagging lists to track defects that need rectification. It serves as a communication tool between the inspecting party and the contractor.
The snagging list includes document identification, project information, a repeatable list of snag items with location, description, severity, status, and photos, plus signatures from the inspector and contractor.
Before a construction project is handed over to the client, a snagging list is used to identify and document all outstanding defects that must be corrected.
Snagging lists can be used at various stages of construction to track quality issues and ensure they are addressed promptly.
The number and severity of snag items can be used to evaluate contractor performance and identify areas for improvement.
After handover, snagging lists may be referenced during warranty periods to verify that defects have been resolved.
Walk through the construction site and identify all snag items, noting their location and describing the defect or incomplete work.
Enter each snag item with its location, description, severity, and status. Attach photos as evidence.
After all snag items are documented, the inspector and contractor sign the list to acknowledge the findings and agree on rectification.
Use the photo report generator to create a comprehensive snagging list with photo evidence for each defect, making it easy to communicate issues to the contractor.
Create Photo ReportCapture snag photos on-site using the mobile app and instantly attach them to your snagging list for accurate documentation.
Mobile AppClick a section to jump to it in the sample document.
The general information about the inspection, including the date, location, and purpose, is provided below.
The building under inspection is identified by its address, purpose, and construction characteristics.
The technical condition of the building structures and elements was evaluated through visual inspection and non-destructive testing methods.
List all snag items with element, defect type, location, description, and photos.
Provide overall comments and status of snag resolution.
List the inspector and contractor.
The signatures of the inspection participants confirm the accuracy of the recorded data and the conclusions drawn.
A snagging list typically refers to minor defects or incomplete works identified before handover, while a defect list may include more significant issues. Both track items that need correction.
The inspector who identifies the snags and the contractor responsible for rectification typically sign the list. This acknowledges the findings and agreement on the scope of work.
Yes, each snag item can have attached photos to provide visual evidence of the defect or incomplete work.
Snag items can be assigned severity levels such as minor, major, or critical to prioritize rectification efforts.
Click the 'Use this template' button to open the online editor. You can then add project details, list snag items, and generate a professional snagging list.
Enter inspection details and generate a ready-to-download document.