Act

Shaft Sinking Inspection Act

Document daily safety and progress of shaft construction with this structured inspection act template. Record ventilation, ground support, lighting, emergency exits, depth excavated, lining installed, and any defects or observations. Open the template in our online editor to start.

Open the template and create your inspection act

View All Templates

The full inspection cycle — in one service

Take photos of the object in the mobile app, complete the inspection report from the template, and download the finished photo report as Word or PDF.

1

Mobile Photo Documentation App

Capture photos on-site with the mobile app and sync them to your shaft sinking inspection act for a complete documentation package.

Mobile App
2

Inspection report

Complete the document from this template: sections, fields, photo documentation, and signatures.

3

Photo Report Generator

Use the photo report generator to attach visual evidence of shaft conditions, defects, and progress directly to your inspection act.

Create Photo Report

Act

Document Preview

Review the structure, sections, and fields before proceeding to fill out the document.

Shaft Sinking Inspection Act

No.SSI-2026-0714

1. General Information

The general information about the inspection, including the purpose, scope, and legal basis, is provided below.

Inspection date7/14/2026 Time7:00 AM — 7:45 AM
AddressVentilation Shaft 2, Thoresby Colliery, Mansfield NG21 0AB Basis for inspectionDaily safety and progress inspection per mining regulations
Expert Alan Foster , Inspector

The inspection was carried out in full compliance with the approved schedule and methodology.

2. Object of Inspection

The inspected object is identified by its name, location, and unique identification data.

Object nameVS-02 Technical conditionnot filled in

The object identification data were verified against the mine plan and found to be accurate.

3. Safety Checklist

The main geometric and operational parameters of the mine workings were measured and compared with design values.

Ventilation AdequateNo Ground Support InstalledNo
Lighting AdequateNo Emergency Exits ClearNo

The measured parameters are within the permissible tolerances specified by the design documentation.

4. Progress Measurements

Additional parameters, including ventilation, lighting, and communication systems, were assessed.

Depth Excavated: 2.5 Lining Installed: 2.0

All additional parameters meet the regulatory requirements for safe operation.

5. Inspection Conditions

The overall condition of the mine workings, including support, roof, and floor, was evaluated.

Inspection conditions are not selected.

The condition of the mine workings is satisfactory, with no critical defects observed.

6. Defects and Observations

List defects and observations such as cracks or instability.

No.Damage descriptionPhotos
1- 0.5not filled in

7. Additional Information

Provide overall assessment and recommendations.

Identification was carried outShaft ID: VS-02
There are remarksAll safety items satisfactory. Progress: 2.5 m excavated, 2.0 m lining installed.

8. Inspection Participants

List the inspector and project manager involved.

No.Full namePosition / statusComment
1Alan FosterInspectorPerformed inspection
2Brian CoxProject ManagerReviewed findings

Signatures

Capture signatures of the inspector and project manager.

______________________________
Alan Foster, Inspector
______________________________
Alan Foster
______________________________
Brian Cox

Act

Purpose and Procedure for Drafting the Document

What Is a Shaft Sinking Inspection Act?

A shaft sinking inspection act is a formal document used to record the safety status and construction progress of a mine shaft during sinking operations. It includes checks on ventilation, ground support, lighting, and emergency exits, as well as measurements of depth excavated and lining installed. This template helps inspectors systematically capture all required data.

Key Sections of the Template

The template includes sections for inspection details, a safety checklist, progress measurements, defects and observations, and signatures. Each section contains fields for relevant data such as shift, ground conditions, defect types, and inspector and project manager signatures.

Who Uses This Document?

This document is typically used by mine inspectors, project managers, and safety officers during daily shaft sinking operations. It serves as a record for regulatory compliance and project monitoring.

Daily Shaft Sinking Operations

Inspectors use this act to document the condition and progress of shaft sinking each shift. It ensures that safety items are checked and progress is recorded systematically.

Regulatory Compliance

Mining regulations often require formal inspection records for shaft construction. This template helps meet those requirements by providing a structured format for data collection.

Project Management

Project managers review these acts to monitor construction progress, identify recurring issues, and plan corrective actions. The documented data supports decision-making.

Safety Audits

During safety audits, these inspection acts provide evidence that required checks were performed. They can be presented to auditors to demonstrate compliance.

Handover Documentation

When a shaft is completed or handed over to another team, the accumulated inspection acts serve as a record of the construction history and any defects encountered.

  1. 1

    Open the Template

    Open the shaft sinking inspection act template in the online editor. The template is pre-configured with all necessary sections and fields.

  2. 2

    Fill in Inspection Details

    Enter the inspection date, inspector name, shaft ID, and shift. Then proceed through the safety checklist, marking each item as adequate or not.

  3. 3

    Record Progress and Defects

    Measure and record depth excavated and lining installed. Note any defects or observations, attaching photos if needed. Finally, add signatures.

  4. 4

    Export and Share

    Once complete, export the document as a PDF or other format. Share it with the project manager and store it for regulatory records.

Photo Report Generator

Use the photo report generator to attach visual evidence of shaft conditions, defects, and progress directly to your inspection act.

Create Photo Report

Mobile Photo Documentation App

Capture photos on-site with the mobile app and sync them to your shaft sinking inspection act for a complete documentation package.

Mobile App

Document Sections

Click a section to jump to it in the sample document.

General Information

The general information about the inspection, including the purpose, scope, and legal basis, is provided below.

Object of Inspection

The inspected object is identified by its name, location, and unique identification data.

Safety Checklist

The main geometric and operational parameters of the mine workings were measured and compared with design values.

Progress Measurements

Additional parameters, including ventilation, lighting, and communication systems, were assessed.

Inspection Conditions

The overall condition of the mine workings, including support, roof, and floor, was evaluated.

Defects and Observations

List defects and observations such as cracks or instability.

Additional Information

Provide overall assessment and recommendations.

Inspection Participants

List the inspector and project manager involved.

Signatures

Capture signatures of the inspector and project manager.

Document Fields and Columns

General Information

Inspection date
Date of the inspection.
Time
Shift (day/night).
Address
Shaft location.
Basis for inspection
Regulatory basis for the inspection.
Expert
Name of the inspector.

Object of Inspection

Object name
Shaft ID.
Technical condition
Ground conditions encountered.

Defects and Observations

No.
Sequential number of the finding.
Element
Component or area affected.
Defect
Type of defect or observation.
Localization
Exact location of the finding.
Photos
Photographic evidence.
Damage description
Detailed description of the finding.

Inspection Participants

No.
Sequential number of the participant.
Full name
Full name of the participant.
Position / status
Role or job title.
Comment
Additional remarks.

Frequently Asked Questions about Photo Reports and Photo Tables

What is a shaft sinking inspection act?

A shaft sinking inspection act is a formal document used to record the safety status and construction progress of a mine shaft during sinking. It includes checks on ventilation, ground support, lighting, emergency exits, and measurements of depth excavated and lining installed. The template helps inspectors systematically capture all required data for compliance and project monitoring.

Who typically signs this inspection act?

The inspector who conducts the inspection and the project manager who reviews the findings typically sign the document. Their signatures confirm that the inspection was performed and the results are acknowledged.

Can I add photos to the shaft sinking inspection act?

Yes, the template supports attaching photos of the shaft overview, lining condition, and any defects. Using the photo report generator or mobile app, you can easily include visual evidence.

Is this template suitable for regulatory compliance?

The template provides a structured format that aligns with common regulatory requirements for shaft sinking inspections. However, exact compliance depends on your jurisdiction's specific rules. You can customize the template as needed.

How do I start using this template?

Click the 'Use this template' button to open it in our online editor. You can then fill in the fields, add photos, and export the completed document. No download is required.

Create Your Document Online

Enter inspection details and generate a ready-to-download document.