Shaft Sinking Inspection Act
No.SSI-2026-0714
1. General Information
| Inspection date | 7/14/2026 | Time | 7:00 AM — 7:45 AM |
| Address | Ventilation Shaft 2, Thoresby Colliery, Mansfield NG21 0AB | Basis for inspection | Daily safety and progress inspection per mining regulations |
2. Object of Inspection
| Object name | VS-02 | Technical condition | not filled in |
3. Safety Checklist
| Ventilation Adequate | No | Ground Support Installed | No |
| Lighting Adequate | No | Emergency Exits Clear | No |
4. Progress Measurements
| Depth Excavated: 2.5 | Lining Installed: 2.0 |
5. Inspection Conditions
6. Defects and Observations
| No. | Damage description | Photos |
|---|---|---|
| 1 | - 0.5 | not filled in |
7. Additional Information
| Identification was carried out | Shaft ID: VS-02 |
| There are remarks | All safety items satisfactory. Progress: 2.5 m excavated, 2.0 m lining installed. |
8. Inspection Participants
| No. | Full name | Position / status | Comment |
|---|---|---|---|
| 1 | Alan Foster | Inspector | Performed inspection |
| 2 | Brian Cox | Project Manager | Reviewed findings |