Roofing Inspection Report
No.RIR-2026-0714-001
1. General Information
| Inspection date | 7/14/2026 | Address | Building A, Roof Section 2, 123 Main Street, Manchester |
| Basis for inspection | Pre-roofing substrate inspection per contract |
2. Object of Inspection
| Object type | not filled in | Object name | Roof Section 2 - Flat Roof |
| Technical condition | not filled in |
3. Main Parameters
| Deck Condition | Satisfactory | Deck Cleanliness | No |
| Deck Slope | Adequate | Insulation Type | Polyisocyanurate (PIR) Board |
| Insulation Thickness | 100 | Insulation Condition | Good |
| Underlayment Type | Self-adhered modified bitumen | Underlayment Condition | Good |
| Underlayment Laps | Adequate |
4. Inspection Conditions
5. Defects
| No. | Damage description | Photos |
|---|---|---|
| 1 | - | not filled in |
6. Additional Information
| Identification was carried out | Project: Riverside Office Complex, Roof Section 2 |
| There are remarks | Substrate ready for roofing. Minor defect in insulation thickness noted. |
7. Inspection Participants
| No. | Full name | Position / status | Comment |
|---|---|---|---|
| 1 | David Green | Roofing Inspector | Performed substrate inspection. |
| 2 | Robert Brown | Contractor Representative | Present during inspection. |