Document the existing condition of a building before demolition with this detailed inspection report template. Record structural condition, hazardous materials, utilities status, and photo evidence.

Start creating your pre-demolition inspection report now

View All Templates

The full inspection cycle — in one service

Take photos of the object in the mobile app, complete the inspection report from the template, and download the finished photo report as Word or PDF.

1

Mobile Photo Documentation App

Capture photos of the building on-site with the mobile photo documentation app. It streamlines the process of collecting visual evidence for your pre-demolition report.

Mobile App
2

Inspection report

Complete the document from this template: sections, fields, photo documentation, and signatures.

3

Photo Report Generator

Use the photo report generator to easily add and organize photos of the building's existing conditions. It helps create a visual record that supports your inspection findings.

Create Photo Report

Report

Document Preview

Review the structure, sections, and fields before proceeding to fill out the document.

Pre-Demolition Inspection Report

No.PDIR-2026-0003

1. General Information

The general information about the inspection, including the date, time, location, and the parties involved, is provided below.

Inspection date7/14/2026 Address999 Industrial Boulevard, Springfield, IL 62705
Basis for inspectionDemolition permit application #DP-2026-012
Expert David Kim , Structural Engineer

The inspection was conducted in accordance with the applicable regulations and standards.

2. Object of Inspection

The building(s) subject to demolition are described in this section, including their address, construction type, and other identifying details.

Object typeIndustrial Building Object nameWarehouse Building 7
Technical conditionnot filled in

The building(s) were identified and their characteristics were recorded.

3. Inspection Conditions

The overall condition of the building was assessed through visual inspection, focusing on structural integrity and signs of deterioration.

Inspection conditions are not selected.

The condition of the building was found to be consistent with its age and maintenance history.

4. Existing Conditions

List existing conditions and defects, including structural condition, hazardous materials, and photos.

No.Damage descriptionPhotos
1- 1not filled in
2- 1not filled in
3- 4not filled in

5. Additional Information

Provide an overall assessment and recommendations for demolition planning.

Identification was carried outBuilding is a former warehouse scheduled for demolition.
There are remarksUtilities disconnected; hazardous materials identified.

6. Inspection Participants

Record the names and roles of the inspector, demolition contractor, and other participants.

No.Full namePosition / statusComment
1David KimStructural EngineerLead inspector
2Mike BrownDemolition ContractorRepresenting demolition company

Signatures

The inspection report is considered final after being signed by all authorized participants.

______________________________
David Kim, Structural Engineer
______________________________
David Kim
______________________________
Mike Brown

All required signatures have been obtained.

Report

Purpose and Procedure for Drafting the Document

What is a Pre-Demolition Inspection Report?

A pre-demolition inspection report is a formal document that records the existing condition of a building before demolition. It includes documentation of structural condition, hazardous materials, utilities status, and adjacent protection measures.

Who Uses This Report?

Structural engineers, demolition contractors, property owners, and regulatory authorities use this report to ensure safe and compliant demolition. It provides a baseline record of the building's condition.

Key Sections of the Report

The template includes sections for project information, inspection details, existing conditions, defects, photos, and signatures. Each section captures essential data for pre-demolition documentation.

Demolition Planning

Demolition contractors use this report to plan the demolition process, identify hazardous materials, and ensure safety measures are in place.

Regulatory Compliance

Local authorities may require a pre-demolition inspection report to verify that the building is safe for demolition and that hazardous materials are properly managed.

Contractual Documentation

Property owners and contractors use the report as part of the contract to document the building's condition before demolition, helping to avoid disputes.

Environmental Assessment

Environmental consultants use the report to assess the presence of hazardous materials like asbestos and lead, and to plan remediation.

Insurance Purposes

Insurance companies may require a pre-demolition inspection report to assess risk and process claims related to the demolition.

Historical Records

The report serves as a historical record of the building's condition before demolition, which can be useful for future reference or research.

  1. 1

    Site Visit

    Visit the building to conduct a visual inspection and document existing conditions.

  2. 2

    Structural Assessment

    Assess the structural condition of the building, including foundations, walls, and roof.

  3. 3

    Hazard Identification

    Identify and document hazardous materials such as asbestos, lead paint, and other contaminants.

  4. 4

    Report

    Compile all findings into the pre-demolition inspection report and deliver it to the demolition contractor.

Photo Report Generator

Use the photo report generator to easily add and organize photos of the building's existing conditions. It helps create a visual record that supports your inspection findings.

Create Photo Report

Mobile Photo Documentation App

Capture photos of the building on-site with the mobile photo documentation app. It streamlines the process of collecting visual evidence for your pre-demolition report.

Mobile App

Document Sections

Click a section to jump to it in the sample document.

General Information

The general information about the inspection, including the date, time, location, and the parties involved, is provided below.

Object of Inspection

The building(s) subject to demolition are described in this section, including their address, construction type, and other identifying details.

Inspection Conditions

The overall condition of the building was assessed through visual inspection, focusing on structural integrity and signs of deterioration.

Existing Conditions

List existing conditions and defects, including structural condition, hazardous materials, and photos.

Additional Information

Provide an overall assessment and recommendations for demolition planning.

Inspection Participants

Record the names and roles of the inspector, demolition contractor, and other participants.

Signatures

The inspection report is considered final after being signed by all authorized participants.

Document Fields and Columns

General Information

Inspection date
Date of the pre-demolition inspection.
Address
Address of the building to be demolished.
Basis for inspection
Reason for the inspection, such as demolition planning or regulatory requirement.
Expert
Name or qualification of the specialist conducting the inspection.

Object of Inspection

Object type
Type of building entity, e.g., residential or commercial.
Object name
Name or identifier of the building.
Technical condition
Current overall technical condition of the building.

Existing Conditions

No.
Sequential number for each condition entry.
Element
Building element or area being documented.
Defect
Type of defect or condition, e.g., crack, corrosion, hazardous material.
Damage description
Detailed description of the condition.
Photos
Photographs documenting the condition.

Inspection Participants

No.
Sequential number for each participant.
Full name
Full name of the participant.
Position / status
Role or title of the participant.
Comment
Additional notes about the participant's involvement.

Frequently Asked Questions about Photo Reports and Photo Tables

What is a pre-demolition inspection report?

A pre-demolition inspection report is a document that records the existing condition of a building before demolition. It includes details on structural condition, hazardous materials, utilities, and adjacent protection measures.

Who typically uses this report?

Structural engineers, demolition contractors, property owners, and regulatory authorities use this report to ensure safe and compliant demolition. It serves as a baseline record of the building's condition.

What sections are included in the template?

The template includes sections for project information, inspection details, existing conditions, defects, photos, and signatures. Each section is designed to capture key data for pre-demolition documentation.

Can I document hazardous materials in this report?

Yes, the template includes a field for hazardous materials identification. You can record the presence of asbestos, lead, and other contaminants.

Is this template suitable for regulatory compliance?

Yes, the report is designed to meet common regulatory requirements for pre-demolition inspections. It provides a comprehensive record that can be submitted to local authorities.

How do I start using this template?

Simply click 'Use this template' to open it in the online editor. You can then fill in the details, add photos, and generate a professional pre-demolition inspection report.

Create Your Document Online

Enter inspection details and generate a ready-to-download document.