Use the mobile photo documentation app to capture photos of the repaired area on site. Sync images directly to the inspection act for comprehensive documentation.
Mobile AppAct
Create a detailed post-repair inspection act online. Document repair details, inspection results, and any remaining defects. Use this template to verify repair quality and equipment readiness for service.
Start creating your post-repair inspection act now
Take photos of the object in the mobile app, complete the inspection report from the template, and download the finished photo report as Word or PDF.
Use the mobile photo documentation app to capture photos of the repaired area on site. Sync images directly to the inspection act for comprehensive documentation.
Mobile AppComplete the document from this template: sections, fields, photo documentation, and signatures.
Use the photo report generator to create a photo log of the repaired area and test setups. Attach photos to the inspection act for visual evidence of repair quality.
Create Photo ReportAct
Review the structure, sections, and fields before proceeding to fill out the document.
No.PRA-2026-008
The general information about the inspection, including the date, location, and basis for the inspection, is provided below.
| Inspection date | 7/14/2026 | Address | Maintenance Bay 1, 500 Repair Road, Houston, TX 77001 |
| Basis for inspection | Post-repair verification of hydraulic pump overhaul |
The inspection was carried out in full compliance with the regulatory requirements.
The object of inspection is the production equipment identified by its inventory number and technical characteristics.
| Object type | Pumping Equipment | Object name | Centrifugal Pump - Model CP-200 |
| Technical condition | not filled in | Operating Hours, hours | 15000 |
| Release date | 3/15/2020 | Start of operation | 4/1/2020 |
The equipment was identified and its documentation was reviewed.
The main parameters of the equipment were measured and compared with the values specified in the technical documentation.
| Repair Description | Overhaul of hydraulic pump: replaced bearings, seals, and impeller. Aligned shaft and coupling. | Repair Date | 7/12/2026 |
| Repair Performed By | Precision Pump Services Inc. | Parts Replaced | Bearings (2), mechanical seal, impeller, gaskets |
The main parameters are within the permissible tolerances.
Additional parameters were assessed to evaluate the overall condition and performance of the equipment.
| Pressure Test: Pass | Run Test: Pass |
No significant deviations were observed in the additional parameters.
List any remaining or new defects found after repair.
| No. | Damage description | Photos |
|---|---|---|
| 1 | - | not filled in |
Provide overall assessment of repair quality and readiness.
| Identification was carried out | Equipment ID: PUMP-0092 |
| There are remarks | Repair quality satisfactory. Equipment ready for service. |
List the inspector and maintenance manager involved.
| No. | Full name | Position / status | Comment |
|---|---|---|---|
| 1 | David Kim | Inspector | Conducted post-repair inspection. |
| 2 | Susan Lee | Maintenance Manager | Approved return to service. |
Capture signatures of inspector and maintenance manager.
Act
A post-repair inspection act confirms that repair work has been completed satisfactorily and that the equipment is safe to return to service. It documents repair details, inspection results, any remaining defects, and the overall assessment of repair quality.
The act includes sections for object identification, repair details, inspection results, defects, conclusion, and signatures. Inspection results are repeatable to accommodate multiple checks. The conclusion assesses repair quality and equipment readiness.
Using an online template ensures consistent post-repair documentation. The act provides a clear record for maintenance history and can be used for warranty or insurance purposes.
Maintenance teams use the post-repair inspection act to verify that repairs meet quality standards. It documents the inspection results and supports the decision to return equipment to service.
Quality assurance teams review the act to ensure repair procedures were followed correctly. It serves as a quality record for the repair process.
Safety officers check that repaired equipment is safe to operate. The act documents safety checks and any remaining defects that need monitoring.
Warranty claims and insurance policies may require documented proof of repair quality. This act provides evidence that repairs were inspected and approved.
When repairs are performed by external contractors, the act documents the acceptance inspection. It ensures that contracted work meets specifications.
The act becomes part of the equipment's maintenance history. It provides a record of repairs and inspections for future reference.
Inspect the repaired area visually to ensure workmanship quality. Check for any visible defects or incomplete work.
Perform functional tests to verify that the equipment operates correctly after repair. Record test results for each check.
Verify that safety features are functional and that the equipment is safe to operate. Document any remaining safety concerns.
Complete the act with repair details, inspection results, and overall assessment. Obtain signatures from inspector and maintenance manager.
Use the photo report generator to create a photo log of the repaired area and test setups. Attach photos to the inspection act for visual evidence of repair quality.
Create Photo ReportUse the mobile photo documentation app to capture photos of the repaired area on site. Sync images directly to the inspection act for comprehensive documentation.
Mobile AppClick a section to jump to it in the sample document.
The general information about the inspection, including the date, location, and basis for the inspection, is provided below.
The object of inspection is the production equipment identified by its inventory number and technical characteristics.
The main parameters of the equipment were measured and compared with the values specified in the technical documentation.
Additional parameters were assessed to evaluate the overall condition and performance of the equipment.
List any remaining or new defects found after repair.
Provide overall assessment of repair quality and readiness.
List the inspector and maintenance manager involved.
Capture signatures of inspector and maintenance manager.
The repair details section captures a description of the repair work, repair date, who performed the repair, and a list of parts replaced. This provides a complete record of what was done.
Inspection results are recorded in a repeatable section where each check includes a name, result (pass/fail/not applicable), and optional comments. This allows documenting multiple checks.
Any remaining or new defects can be recorded in the defects section. Each defect includes description, severity, and location. The overall assessment may be affected by these defects.
Repair quality is assessed using a select field with options: Satisfactory, Needs Improvement, or Unsatisfactory. Equipment readiness is indicated by a boolean field.
The act requires signatures from the inspector and the maintenance manager. The inspector verifies the repair, and the maintenance manager approves the equipment for return to service.
Enter inspection details and generate a ready-to-download document.