Post-Repair Inspection Act
No.PRA-2026-008
1. General Information
| Inspection date | 7/14/2026 | Address | Maintenance Bay 1, 500 Repair Road, Houston, TX 77001 |
| Basis for inspection | Post-repair verification of hydraulic pump overhaul |
2. Object of Inspection
| Object type | not filled in | Object name | Centrifugal Pump - Model CP-200 |
| Technical condition | not filled in | Operating Hours, hours | 15000 |
| Release date | 3/15/2020 | Start of operation | 4/1/2020 |
3. Main Parameters
| Repair Description | Overhaul of hydraulic pump: replaced bearings, seals, and impeller. Aligned shaft and coupling. | Repair Date | 7/12/2026 |
| Repair Performed By | Precision Pump Services Inc. | Parts Replaced | Bearings (2), mechanical seal, impeller, gaskets |
4. Additional Parameters
| Pressure Test: Pass | Run Test: Pass |
5. Defects
| No. | Damage description | Photos |
|---|---|---|
| 1 | - | not filled in |
6. Additional Information
| Identification was carried out | Equipment ID: PUMP-0092 |
| There are remarks | Repair quality satisfactory. Equipment ready for service. |
7. Inspection Participants
| No. | Full name | Position / status | Comment |
|---|---|---|---|
| 1 | David Kim | Inspector | Conducted post-repair inspection. |
| 2 | Susan Lee | Maintenance Manager | Approved return to service. |