Post-Flood Inspection Report
No.PFI-2026-022
1. General Information
| Inspection date | 7/14/2026 | Time | 2:00 PM — 4:00 PM |
| Address | Riverbend Levee, 100 Levee Drive, Riverbend, WA 98577 | Basis for inspection | Post-flood assessment after June 2026 flood event |
2. Object of Inspection
| Object name | Riverbend Levee | Technical condition | not filled in |
3. Main Parameters
| Structure Type | Levee | Flood Event | June 2026 flood, peak 4.2 m |
| Damage Severity | Moderate |
4. Inspection Conditions
5. Inspection Findings
| No. | Damage description | Photos |
|---|---|---|
| 1 | - | not filled in |
| 2 | - | not filled in |
| 3 | - | not filled in |
6. Pre-existing Damage
| No. | Element | Defect | Photos |
|---|---|---|---|
| 1 | not filled in | not filled in | not filled in |
| 2 | not filled in | not filled in | not filled in |
7. Additional Information
| Identification was carried out | Inspection of levee after flood crest of 4.2 m. |
| There are remarks | Moderate erosion on landside slope; immediate repair recommended. |
8. Inspection Participants
| No. | Full name | Position / status | Comment |
|---|---|---|---|
| 1 | Daniel Foster | Inspector | Lead inspector |