Pipeline Repair Report
No.PRR-2026-0023
1. General Information
| Inspection date | 7/14/2026 | Address | Pipeline Segment KM 45, Alberta |
| Basis for inspection | Repair work order WO-2026-045 |
2. Object of Inspection
| Object name | PL-ALB-001 | Technical condition | not filled in |
3. Repair Details
| Repair Method | Composite sleeve | Materials Used | Clock Spring composite wrap, epoxy adhesive |
| Repair Technician | Tom Baker |
4. Post-Repair Testing
| Test Type: Hydrostatic pressure test | Test Result: Pass |
| Test Date: 7/14/2026 |
5. Defect Repaired
| No. | Damage description | Photos |
|---|---|---|
| 1 | - | not filled in |
6. Additional Information
| Identification was carried out | Pipeline ID: PL-ALB-001 |
| There are remarks | Repair completed successfully. Hydrostatic test passed at 1.5x MAOP. |
7. Inspection Participants
| No. | Full name | Position / status | Comment |
|---|---|---|---|
| 1 | Tom Baker | Repair Technician | Performed repair |
| 2 | Steve Adams | Repair Supervisor | Supervised repair |
| 3 | Laura King | Pipeline Operator | Approved repair |