Pipeline Inspection Report
No.PIR-2026-0087
1. General Information
| Inspection date | 7/14/2026 | Address | Segment 7B, near Odessa, TX |
| Basis for inspection | Annual integrity assessment per 49 CFR 195 |
2. Object of Inspection
| Object name | West Texas Gas Main 7B | Technical condition | not filled in |
| Release date | 6/1/2005 |
3. Main Parameters
| Diameter | 24 | Length | 5.2 |
| Material | Carbon Steel |
4. Additional Parameters
| Wall Thickness at Station 23+100: 4.8 | Corrosion Rate: 0.15 |
5. Defects
| No. | Damage description | Photos |
|---|---|---|
| 1 | - 3.2 | not filled in |
| 2 | - | not filled in |
| 3 | - 1.8 | not filled in |
6. Additional Information
| Identification was carried out | Pipeline identified by segment ID and GPS coordinates. |
| There are remarks | Overall condition rated fair. Corrosion found at 3 locations. Recommended repair within 6 months. |
7. Inspection Participants
| No. | Full name | Position / status | Comment |
|---|---|---|---|
| 1 | Michael Torres | Pipeline Integrity Inspector | Conducted field inspection and UT measurements. |
| 2 | Emily Chen | Pipeline Operator Representative | Reviewed findings and approved report. |