Mobile Photo Documentation App
Capture manhole photos on-site with the mobile app. Annotate images with location and defect details, then sync to your report.
Mobile AppReport
Create a detailed manhole survey report to assess condition and safety. This template helps you record manhole details, cover and frame condition, internal structure, defects, and recommendations.
Start your survey report now
Take photos of the object in the mobile app, complete the inspection report from the template, and download the finished photo report as Word or PDF.
Capture manhole photos on-site with the mobile app. Annotate images with location and defect details, then sync to your report.
Mobile AppComplete the document from this template: sections, fields, photo documentation, and signatures.
Use the photo report generator to create manhole survey reports with embedded photos. Attach images of cover, frame, and internal structure.
Create Photo ReportReport
Review the structure, sections, and fields before proceeding to fill out the document.
No.MHS-2026-0714-01
The inspection was conducted in accordance with the applicable regulations and standards for sewerage systems.
| Inspection date | 7/14/2026 | Address | Junction of Elm Street and Park Lane, Liverpool |
| Basis for inspection | Routine condition assessment |
The overall condition of the sewerage networks has been assessed and documented.
The object of inspection includes the sewerage networks, comprising pipelines, manholes, and associated structures.
| Object name | MH-2026-01 | Technical condition | not filled in |
The inspected sewerage networks are identified and described in this section.
The main parameters of the sewerage networks, such as diameter, material, and depth, were determined based on design documentation and field measurements.
| Manhole Type | Access | Cover Type | Cast iron |
The main parameters were verified and found to be consistent with the design values.
List defects and observations found during the survey, with descriptions and photos.
| No. | Damage description | Photos |
|---|---|---|
| 1 | - | not filled in |
| 2 | - 5 | not filled in |
| 3 | - 0.4 | not filled in |
Provide overall condition assessment, recommendations, and priority actions.
| Identification was carried out | Manhole ID: MH-2026-01 |
| There are remarks | Overall condition assessed as fair. |
List the surveyor and asset manager involved in the inspection.
| No. | Full name | Position / status | Comment |
|---|---|---|---|
| 1 | Emily Watson | Surveyor | Conducted the manhole survey |
| 2 | Michael Brown | Asset Manager | Reviewed the survey report |
Capture signatures of the surveyor and reviewer to confirm the report.
Report
A manhole survey report documents the condition and safety of manholes in sewer networks. It includes details of the manhole structure, cover, frame, internal condition, and any defects or inflow evidence. The report supports asset management and safety compliance.
Surveyors and asset managers use this report to record manhole inspections and prioritize maintenance. It is essential for condition assessment and safety checks.
The report includes survey identification, manhole details, findings, conclusions, and signatures. Each manhole is assessed for cover condition, frame condition, internal condition, and structural integrity.
Regular manhole surveys help identify structural issues, cover defects, and inflow problems. This report documents the condition of each manhole for maintenance planning.
Manholes pose safety risks if covers are missing or damaged. This report records safety-related findings and recommended corrective actions.
Manholes are common entry points for inflow and infiltration. This report documents evidence of inflow and helps prioritize sealing efforts.
Asset managers use survey data to plan rehabilitation and replacement of manholes. The report provides condition ratings and priority actions.
Identify the manhole location, open the cover safely, and ventilate if necessary. Ensure safe entry conditions.
Inspect the cover, frame, internal walls, steps, benching, and check for inflow or structural damage. Record observations.
Fill in the survey details, manhole condition, findings, and recommendations. The surveyor and asset manager sign to confirm the report.
Use the photo report generator to create manhole survey reports with embedded photos. Attach images of cover, frame, and internal structure.
Create Photo ReportCapture manhole photos on-site with the mobile app. Annotate images with location and defect details, then sync to your report.
Mobile AppClick a section to jump to it in the sample document.
The inspection was conducted in accordance with the applicable regulations and standards for sewerage systems.
The object of inspection includes the sewerage networks, comprising pipelines, manholes, and associated structures.
The main parameters of the sewerage networks, such as diameter, material, and depth, were determined based on design documentation and field measurements.
List defects and observations found during the survey, with descriptions and photos.
Provide overall condition assessment, recommendations, and priority actions.
List the surveyor and asset manager involved in the inspection.
Capture signatures of the surveyor and reviewer to confirm the report.
The inspection covers the cover, frame, internal walls, steps, benching, and structural integrity. Evidence of inflow or infiltration is also noted.
Cover condition is rated as Good, Fair, Poor, or Missing. Similarly, frame condition and internal condition are rated Good, Fair, or Poor.
Structural integrity is assessed as Sound, Minor Damage, Major Damage, or Critical. This helps prioritize repairs.
The surveyor and asset manager sign the report. The surveyor confirms the findings, and the asset manager acknowledges the condition and recommendations.
Click 'Use this template' to open it in the online editor. Fill in the survey details, manhole condition, and findings, then generate the report.
Enter inspection details and generate a ready-to-download document.