Instrumentation Monitoring Report
No.IM-2026-0065
1. General Information
| Inspection date | 7/14/2026 | Address | Oroville Dam, Oroville, CA 95966 |
2. Object of Inspection
| Object name | Oroville Dam | Technical condition | not filled in |
3. Main Parameters
| Reporting period | June 14, 2026 - July 14, 2026 | Number of instruments | 24 |
4. Additional Parameters
| Piezometer PZ-07 reading: 215.4 | Inclinometer INC-03 displacement: 2.1 |
| Weir W-02 flow: 1.8 |
5. Inspection Findings
| No. | Damage description | Photos |
|---|---|---|
| 1 | - | not filled in |
| 2 | - | not filled in |
6. Additional Information
| Identification was carried out | All instruments identified by ID tags and logged in monitoring database |
| There are remarks | Piezometer PZ-07 shows rising trend. Inclinometer INC-03 stable. Weir W-02 flow within normal range. |
7. Abbreviations and Symbols
8. Inspection Participants
| No. | Full name | Position / status | Comment |
|---|---|---|---|
| 1 | Dr. Rachel Adams | Geotechnical Engineer | Report preparer |
| 2 | John Miller | Instrumentation Technician | Data collection |