Act

Individual Heating Point Inspection Act

Document the condition and defects of an individual heating point (IHP) with our structured inspection act template. Record component inspections, measurements, and signatures.

Start your IHP inspection act now

View All Templates

The full inspection cycle — in one service

Take photos of the object in the mobile app, complete the inspection report from the template, and download the finished photo report as Word or PDF.

1

Mobile Photo Documentation App

Capture IHP inspection photos on-site with the mobile app and sync them directly to your act. It speeds up field documentation and reduces errors.

Mobile App
2

Inspection report

Complete the document from this template: sections, fields, photo documentation, and signatures.

3

Photo Report Generator

Use the photo report generator to create professional IHP inspection acts with embedded photos and structured defect entries. It streamlines documentation.

Create Photo Report

Act

Document Preview

Review the structure, sections, and fields before proceeding to fill out the document.

Individual Heating Point Inspection Act

No.IHP-2026-031

1. General Information

The general information about the inspection, including the date, location, and inspection team, is provided below.

Inspection date7/14/2026 Address42 Maple Street, Springfield, IL 62701
Basis for inspectionSeasonal readiness inspection
Expert David Kim , HVAC Inspector

The inspection was conducted in accordance with the approved schedule and methodology.

2. Object of Inspection

The inspected object is an individual heating point (IHP) located at the specified address, serving the building's heating and hot water systems.

Object TypeIndividual Heating Point Object NameIHP-Building A
Technical Statenot filled in Release Date8/20/2015
Start of Operation10/1/2015

The object was identified and its boundaries were established for the purpose of this inspection.

3. Main Parameters

The main parameters of the IHP, including design heat load, operating temperatures, and pressure, were verified against the project documentation.

Heat Exchanger TypePlate Pump Power1.5
Meter ModelKamstrup Multical 602

The main parameters comply with the design values within the permissible tolerances.

4. Additional Parameters

Additional parameters such as flow rates, valve settings, and control system configurations were checked for proper operation.

Supply Temperature: 75 Return Temperature: 50

No significant deviations were found in the additional parameters.

5. Inspection Conditions

The operating conditions of the IHP, including ambient temperature, humidity, and accessibility, were assessed during the inspection.

Inspection conditions are not selected.

The conditions were found to be within the normal operating range.

6. Defects

List and describe any defects found during inspection, including location, extent, and photos.

No.Damage descriptionPhotos
1- 15not filled in
2- 1not filled in
3- 5not filled in

7. Additional Information

Provide overall condition assessment and recommendations.

Identification was carried outIHP serving building A
There are remarksHeat exchanger fouling noted; pump operational.

8. Inspection Participants

List the inspector, building owner, and technician involved.

No.Full namePosition / statusComment
1David KimInspectorLead inspector
2Linda GrayBuilding OwnerPresent during inspection
3Tom BakerTechnicianAssisted with system access

Signatures

Capture signatures of inspector and building owner.

______________________________
David Kim, HVAC Inspector
______________________________
David Kim
______________________________
Linda Gray
______________________________
Tom Baker

Act

Purpose and Procedure for Drafting the Document

What Is an Individual Heating Point Inspection Act?

An individual heating point (IHP) inspection act is an official document that records the condition, defects, and measurements of a heating point. It is used for routine inspections, seasonal readiness checks, or handover procedures.

Who Uses This Document?

Inspectors, building owners, and maintenance technicians use this act to document the state of the IHP. It serves as a formal record for compliance and maintenance planning.

Key Sections of the Act

The act includes object identification, inspection context, component inspection, defects, observations, measurements, conclusions, and signatures.

Seasonal Readiness Inspection

Before the heating season, an IHP inspection act verifies that the system is ready for operation. It documents any defects that need correction.

Handover or Acceptance

When a new IHP is installed or ownership changes, the inspection act records the condition at handover. It helps resolve disputes about pre-existing defects.

Routine Maintenance

Regular inspections help identify wear, leaks, or corrosion early. The act supports planning of maintenance and repairs.

Regulatory Compliance

In some jurisdictions, IHP inspections are required by regulations. The act provides documented evidence of compliance.

  1. 1

    Preparation

    The inspector reviews previous records and prepares the inspection checklist. The IHP is isolated if necessary.

  2. 2

    Visual Inspection

    Each component of the IHP is visually inspected: heat exchanger, circulation pump, meters, piping, and safety devices. Defects and observations are recorded.

  3. 3

    Functional Testing

    Operational tests are performed, including pressure checks, temperature measurements, and flow verification. Results are recorded.

  4. 4

    Documentation and Signatures

    The completed act is reviewed and signed by the inspector and building owner. Copies are distributed to relevant parties.

Photo Report Generator

Use the photo report generator to create professional IHP inspection acts with embedded photos and structured defect entries. It streamlines documentation.

Create Photo Report

Mobile Photo Documentation App

Capture IHP inspection photos on-site with the mobile app and sync them directly to your act. It speeds up field documentation and reduces errors.

Mobile App

Document Sections

Click a section to jump to it in the sample document.

General Information

The general information about the inspection, including the date, location, and inspection team, is provided below.

Object of Inspection

The inspected object is an individual heating point (IHP) located at the specified address, serving the building's heating and hot water systems.

Main Parameters

The main parameters of the IHP, including design heat load, operating temperatures, and pressure, were verified against the project documentation.

Additional Parameters

Additional parameters such as flow rates, valve settings, and control system configurations were checked for proper operation.

Inspection Conditions

The operating conditions of the IHP, including ambient temperature, humidity, and accessibility, were assessed during the inspection.

Defects

List and describe any defects found during inspection, including location, extent, and photos.

Additional Information

Provide overall condition assessment and recommendations.

Inspection Participants

List the inspector, building owner, and technician involved.

Signatures

Capture signatures of inspector and building owner.

Document Fields and Columns

General Information

Inspection date
Date when the inspection was performed.
Address
Physical address of the individual heating point.
Basis for inspection
Legal or contractual basis for the inspection.
Expert
Name and qualification of the inspecting specialist.

Object of Inspection

Object Type
Type of heating point (e.g., individual, central).
Object Name
Name or designation of the IHP.
Technical State
Overall technical condition of the IHP.
Release Date
Date of manufacture or installation.
Start of Operation
Date when the IHP was commissioned.

Defects

No.
Sequential number of the defect entry.
Element
Component where the defect was found.
Defect
Type of defect (e.g., leak, corrosion).
Localization
Specific location of the defect within the component.
Volume
Extent or quantity of the defect.
Unit
Unit of measurement for the volume.
Repair type
Severity or impact of the defect.
Photos
Photo evidence of the defect.
Damage description
Detailed description of the defect.
Repair
Recommended repair action.

Inspection Participants

No.
Sequential number of the participant.
Full name
Full name of the participant.
Position / status
Role or position of the participant.
Comment
Additional comments about the participant.

Frequently Asked Questions about Photo Reports and Photo Tables

What components are typically inspected in an IHP?

Common components include the heat exchanger, circulation pump, meters, piping, valves, expansion vessel, and safety devices. The template allows you to inspect any component.

What types of defects are commonly found?

Typical defects include leaks, corrosion, cracks, fouling, cavitation, bearing wear, seal leaks, meter inaccuracy, and pump failure.

Is photo documentation required?

Yes, the template requires photos of the overall system, insulation condition, safety devices, and any defects. Photos provide visual evidence of the IHP condition.

Who signs the inspection act?

The inspector and the building owner or their representative sign the act. A technician may also sign if present.

How do I start using this template?

Click 'Use this template' to open the online editor. You can then fill in the inspection details, add component inspections, upload photos, and generate the final document.

Create Your Document Online

Enter inspection details and generate a ready-to-download document.