Hydroelectric Power Plant Inspection Report
No.HEP-2026-042
1. General Information
| Inspection date | 7/14/2026 | Address | 150 River Road, Glen Canyon, AZ 86040 |
| Basis for inspection | Routine annual inspection |
2. Object of Inspection
| Object name | Glen Canyon Hydro Station | Technical condition | not filled in |
3. Plant Parameters
| Installed Capacity | 120 | Head Height | 85 |
| Number of Units | 4 |
4. Inspection Conditions
5. Component Findings
| No. | Damage description | Photos |
|---|---|---|
| 1 | - 0.5 | not filled in |
| 2 | - 3 | not filled in |
| 3 | - 2 | not filled in |
6. Conclusions and Recommendations
| Identification was carried out | Turbine unit #3 and dam section B |
| There are remarks | Overall condition satisfactory; minor seepage noted at dam joint. |
7. Abbreviations and Symbols
8. Inspection Participants
| No. | Full name | Position / status | Comment |
|---|---|---|---|
| 1 | James Mitchell | Civil Engineer | Lead inspector for dam and penstock |
| 2 | Sarah Chen | Mechanical Engineer | Inspected turbines and generators |
| 3 | Robert Torres | Plant Manager | Reviewed findings |