HVAC Inspection Report
No.HIR-2026-156
1. General Information
| Inspection date | 7/14/2026 | Address | 123 Main Street, Building A, New York, NY 10001 |
| Basis for inspection | Scheduled semi-annual inspection |
2. Object of Inspection
| System Type | not filled in | System Name | Building A HVAC System |
| Technical State | not filled in | Installation Date | 3/15/2019 |
| Commissioning Date | 4/1/2019 |
3. Main Parameters
| System Type | Chilled water VAV | Chiller Model | Carrier 30RB |
| Cooling Capacity | 500 |
4. Additional Parameters
| Supply Air Temperature: 12.5 | Return Air Temperature: 24.0 |
| Chilled Water Supply Temperature: 6.5 |
5. Inspection Conditions
6. Findings
| No. | Damage description | Photos |
|---|---|---|
| 1 | - | not filled in |
| 2 | - | not filled in |
| 3 | - | not filled in |
7. Additional Information
| Identification was carried out | HVAC system serving floors 1-5 |
| There are remarks | System overall satisfactory; minor issues noted. |
8. Inspection Participants
| No. | Full name | Position / status | Comment |
|---|---|---|---|
| 1 | Andrew Lee | Inspector | Performed full HVAC inspection. |
| 2 | Maria Garcia | Facility Manager | Accompanied inspector. |