Mobile Photo Documentation App
Capture photos of the heat exchanger overview, nameplate, and defects on site with the mobile app for inclusion in the checklist.
Mobile AppChecklist
Ensure all critical points of a heat exchanger are checked during inspection. This checklist covers visual inspection, tube inspection, measurements, and findings. Open the template in the online editor to start.
Start with this template
Take photos of the object in the mobile app, complete the inspection report from the template, and download the finished photo report as Word or PDF.
Capture photos of the heat exchanger overview, nameplate, and defects on site with the mobile app for inclusion in the checklist.
Mobile AppComplete the document from this template: sections, fields, photo documentation, and signatures.
Generate a professional inspection checklist with photos of the heat exchanger and defects using the photo report generator.
Create Photo ReportChecklist
Review the structure, sections, and fields before proceeding to fill out the document.
No.HEIC-2026-005
The general information about the inspection, including date, location, and inspector details, is provided below.
| Inspection date | 7/14/2026 | Address | Boiler Room, Building A, Chemical Plant, Liverpool L1 2AB |
The inspection was conducted under normal operating conditions.
The heat exchanger under inspection is identified by its serial number and installation location.
| Object type | Shell and tube heat exchanger | Object name | HX-101 |
| Technical condition | not filled in | Release date | 3/15/2019 |
| Start of operation | 4/1/2019 |
The object data were verified against the equipment passport.
The main parameters of the heat exchanger, such as design pressure, temperature, and heat transfer area, were determined from the technical documentation.
| External Condition | Fair | Corrosion Observed | ☐ |
| Leaks Observed | ☐ | Fouling Observed | ☐ |
| Insulation Condition | Good |
The measured parameters are within the permissible limits.
Additional parameters including flow rates, pressure drops, and material specifications were assessed.
| Tube Number: Row 5-8 | Tube Condition: Fair |
| Tube Defects: | Inlet Temperature: 85 |
| Outlet Temperature: 60 | Pressure Drop: 15 |
No significant deviations from the specified values were observed.
List any defects found during inspection.
| No. | Damage description | Photos |
|---|---|---|
| 1 | - | not filled in |
Summarize findings and provide recommendations.
| Identification was carried out | Shell and tube heat exchanger HX-101 |
| There are remarks | Overall condition fair. Some fouling on tube bundle. Cleaning recommended. |
List the inspector and maintenance engineer involved.
| No. | Full name | Position / status | Comment |
|---|---|---|---|
| 1 | Robert King | Maintenance Engineer | Performed inspection |
| 2 | James Lee | Inspector | Reviewed findings |
Capture signatures of inspector and maintenance engineer.
Checklist
A heat exchanger inspection checklist is a structured document used to ensure all critical points of a heat exchanger are checked during an inspection. It covers visual inspection, tube inspection, measurements, and findings.
This template is used by maintenance engineers, inspectors, and technicians responsible for inspecting heat exchangers in industrial, commercial, or HVAC systems.
The template includes sections for inspection identification, visual inspection, tube inspection (repeatable), measurements, findings, attachments, and signatures. It supports defect and observation references.
For routine inspections of heat exchangers to identify fouling, corrosion, leaks, or other issues before they cause performance decline.
When heat exchanger performance declines (e.g., reduced heat transfer, increased pressure drop), this checklist helps identify the root cause.
After cleaning, this checklist verifies that the heat exchanger is in good condition and ready for service.
Organizations can use this template to track the condition of heat exchangers over time and plan maintenance or replacement.
Isolate the heat exchanger, ensure it is safe to inspect, and perform any necessary disassembly or cleaning.
Inspect external surfaces and accessible internal areas for corrosion, leaks, fouling, and insulation condition.
Inspect each tube or representative sample for fouling, corrosion, pitting, and leaks. Record condition and defects.
Record measurements (temperatures, pressure drop, flow rate), summarize findings, and obtain signatures.
Generate a professional inspection checklist with photos of the heat exchanger and defects using the photo report generator.
Create Photo ReportCapture photos of the heat exchanger overview, nameplate, and defects on site with the mobile app for inclusion in the checklist.
Mobile AppClick a section to jump to it in the sample document.
The general information about the inspection, including date, location, and inspector details, is provided below.
The heat exchanger under inspection is identified by its serial number and installation location.
The main parameters of the heat exchanger, such as design pressure, temperature, and heat transfer area, were determined from the technical documentation.
Additional parameters including flow rates, pressure drops, and material specifications were assessed.
List any defects found during inspection.
Summarize findings and provide recommendations.
List the inspector and maintenance engineer involved.
Capture signatures of inspector and maintenance engineer.
This checklist is suitable for shell and tube, plate, finned, and other common heat exchanger types. The template includes a field to specify the type.
Key measurements include inlet and outlet temperatures, pressure drop, flow rate, and wall thickness. These help assess performance and condition.
A qualified inspector or maintenance engineer with knowledge of heat exchanger operation and failure modes should perform the inspection.
Common defects include corrosion, leaks, fouling, pitting, and scale buildup. The template allows referencing predefined defects or adding custom observations.
Yes, photo evidence is required for the general overview and nameplate. Photos of defects are conditionally required if any defects are observed.
Enter inspection details and generate a ready-to-download document.