Gas Tightness Test Certificate
No.GTTC-2026-042
1. General Information
| Inspection date | 7/14/2026 | Address | 12 Station Road, Manchester M1 2AB |
2. Object of Inspection
| Object type | not filled in | Object name | New boiler gas supply pipework |
3. Main Parameters
| Test Pressure | 20 | Test Duration | 2 |
| Pressure Drop | 0.5 | Test Result | Pass |
4. Additional Parameters
| Equipment Used: Kane 458 Pressure Gauge | Observations: No leaks detected. System held pressure. |
5. Additional Information
| Identification was carried out | New gas pipework for boiler installation |
| There are remarks | Test passed. System is gas-tight. |
6. Inspection Participants
| No. | Full name | Position / status | Comment |
|---|---|---|---|
| 1 | David Green | Gas Safe Registered Engineer | Performed test |
| 2 | Robert Wilson | Witness (Homeowner) | Present during test |