Gas Network Pipeline Inspection Report
No.GNPIR-2026-07-14-008
1. General Information
| Inspection date | 7/14/2026 | Address | Section 4B, Gas Distribution Network, Nottingham NG7 2RD |
| Basis for inspection | Annual integrity inspection |
2. Object of Inspection
| Object type | not filled in | Object name | Main Feeder Line 4B |
| Technical condition | not filled in | Release date | 6/1/2010 |
| Start of operation | 9/15/2010 |
3. Main Parameters
| Pipe material | Steel | Pipe diameter | 12 |
| Pipe length | 1500 | Operating pressure | 7 |
4. Inspection Conditions
5. Inspection Findings
| No. | Damage description | Photos |
|---|---|---|
| 1 | - 1.2 | not filled in |
| 2 | - 2 | not filled in |
6. Additional Information
| Identification was carried out | Pipeline identified by asset ID and GPS coordinates. |
| There are remarks | Pipeline generally in good condition; minor corrosion found at one joint. |
7. Inspection Participants
| No. | Full name | Position / status | Comment |
|---|---|---|---|
| 1 | Kevin Scott | Pipeline Integrity Engineer | Lead inspector |
| 2 | Mark Wilson | Network Operator Representative | Accompanied inspection |