Gas Installation Inspection Report
No.GII-2026-0714
1. General Information
| Inspection date | 7/14/2026 | Address | 30 High Street, Oxford OX1 2AB |
| Basis for inspection | New installation inspection |
2. Object of Inspection
| Object type | not filled in | Object name | Restaurant kitchen gas system |
| Technical condition | not filled in |
3. Main Parameters
| Pipework Condition | Satisfactory | Pipework Material | Copper |
| Pipework Supports | Adequate | Ventilation Adequate | No |
4. Additional Parameters
| Test Pressure: 20 | Test Duration: 5 |
| Pressure Drop: 0.3 | Tightness Test Result: Pass |
5. Inspection Findings
| No. | Damage description | Photos |
|---|---|---|
| 1 | - | not filled in |
| 2 | - | not filled in |
| 3 | - | not filled in |
6. Additional Information
| Identification was carried out | Installation: New gas supply for restaurant kitchen |
| There are remarks | Installation compliant. Tightness test passed. All appliances operational. |
7. Inspection Participants
| No. | Full name | Position / status | Comment |
|---|---|---|---|
| 1 | Paul Harris | Inspector | Gas Safe registered engineer |
| 2 | Sophie Turner | Restaurant Owner | Property owner |