Verify fireproofing thickness and adhesion on structural steel elements with this detailed inspection report template. Record measurements, test results, and compliance status in an online editor.
Start your fireproofing inspection report
Take photos of the object in the mobile app, complete the inspection report from the template, and download the finished photo report as Word or PDF.
Capture fireproofing inspection photos on-site with the mobile app and seamlessly integrate them into your report for accurate field documentation.
Mobile AppComplete the document from this template: sections, fields, photo documentation, and signatures.
Use the photo report generator to attach images of thickness gauge readings, adhesion test areas, and defect close-ups to your inspection report.
Create Photo ReportReport
Review the structure, sections, and fields before proceeding to fill out the document.
No.FPI-2026-001
The inspection was conducted in accordance with applicable standards and procedures for structural steel assessment.
| Inspection date | 7/14/2026 | Address | 1200 Commerce Blvd, Building A, Floor 3, Chicago, IL 60607 |
The overall condition of the structural steel was evaluated and is summarized in this report.
The object of inspection is the structural steel framework, including columns, beams, and connections.
| Object name | Beam B-12 | Technical condition | not filled in |
The structural steel elements were identified and their locations noted for reference.
Main parameters such as dimensions, steel grade, and design loads were verified against project documentation.
| Fireproofing Material | SFRM (Spray-Applied Fire Resistive Material) | Application Method | Spray |
| Required Thickness | 40 |
The main parameters of the structural steel were found to conform to the design specifications.
Record thickness measurements, adhesion test results, coverage verification, and any defects observed on each element.
| No. | Damage description | Photos |
|---|---|---|
| 1 | - 38 | not filled in |
Provide overall compliance status and recommendations.
| Identification was carried out | Structural steel beam B-12 |
| There are remarks | Fireproofing thickness meets specification for all measured points. |
List the inspection participants: fire protection inspector, applicator, and building official.
| No. | Full name | Position / status | Comment |
|---|---|---|---|
| 1 | James Carter | Fire Protection Inspector | Lead inspector |
| 2 | Robert Mitchell | Applicator | Representative of FireSafe Coatings Inc. |
| 3 | Sarah Thompson | Building Official | City of Chicago Building Department |
Capture signatures of the fire protection inspector, applicator, and building official.
Report
A fireproofing inspection report documents the verification of fireproofing application on structural steel elements. It includes thickness measurements, adhesion test results, coverage verification, and an overall compliance assessment.
Fire protection inspectors, applicators, building officials, and project managers use this report to ensure fireproofing meets specifications. It is commonly used during construction and commissioning phases.
The report includes sections for inspection information, fireproofing details, repeatable inspection results (per element), conclusions and recommendations, and signatures of involved parties.
During construction, inspectors use this report to verify that fireproofing applied to structural steel meets the required thickness and adhesion standards before acceptance.
Building officials may require this report as part of the documentation to demonstrate compliance with fire protection codes and standards.
At project completion, the fireproofing inspection report is often included in the handover documentation to confirm that fireproofing work has been properly inspected and approved.
Property owners and insurers may request fireproofing inspection reports to assess fire risk and ensure that fire protection measures are in place.
Ensure fireproofing material has been applied and cured. Gather specifications for required thickness and adhesion criteria.
Check that the steel surface is properly prepared before fireproofing application, including cleanliness and primer if required.
For each structural element, measure fireproofing thickness using a gauge and perform adhesion tests as specified. Record results.
Complete the report with findings, overall status, and recommendations. Obtain signatures from the inspector, applicator, and building official.
Use the photo report generator to attach images of thickness gauge readings, adhesion test areas, and defect close-ups to your inspection report.
Create Photo ReportCapture fireproofing inspection photos on-site with the mobile app and seamlessly integrate them into your report for accurate field documentation.
Mobile AppClick a section to jump to it in the sample document.
The inspection was conducted in accordance with applicable standards and procedures for structural steel assessment.
The object of inspection is the structural steel framework, including columns, beams, and connections.
Main parameters such as dimensions, steel grade, and design loads were verified against project documentation.
Record thickness measurements, adhesion test results, coverage verification, and any defects observed on each element.
Provide overall compliance status and recommendations.
List the inspection participants: fire protection inspector, applicator, and building official.
Capture signatures of the fire protection inspector, applicator, and building official.
The report records fireproofing thickness measurements for each structural element, along with adhesion test results (pass/fail) and coverage verification (yes/no).
Yes, the inspection results section includes a defects field where you can reference predefined defect types such as 'fireproofing thin spots' or add custom descriptions.
The report includes signature fields for the fire protection inspector, applicator, and building official. All three parties typically sign to confirm the inspection results.
The template provides a structured format for documenting fireproofing inspections, which can support code compliance efforts. However, specific requirements may vary by jurisdiction.
Yes, the report includes photo requirements for fireproofing application overview, thickness measurement close-ups, adhesion test areas, and defect areas. Use the photo report generator to attach images.