Inspect concealed MEP systems before wall and ceiling closure. Record component conditions, test results, defects, and photo evidence in a structured online report.
Start with this template
Take photos of the object in the mobile app, complete the inspection report from the template, and download the finished photo report as Word or PDF.
Capture inspection photos and data on-site with the mobile app. Sync everything to the report template for a seamless workflow from field to office.
Mobile AppComplete the document from this template: sections, fields, photo documentation, and signatures.
Use the photo report generator to attach photos of ductwork, piping, conduit, and cable trays. Visual evidence is essential for documenting the condition before closure.
Create Photo ReportReport
Review the structure, sections, and fields before proceeding to fill out the document.
No.ENIR-2026-0033
The inspection was conducted in accordance with applicable standards and regulations for engineering network closure.
| Inspection date | 7/14/2026 | Address | Sunset Heights Condominium, 500 Ocean View Drive, Miami, FL 33101 |
| Basis for inspection | Pre-closure inspection of MEP systems |
The overall condition of the networks was assessed and documented.
The object of inspection is the engineering networks scheduled for closure, including their components and associated infrastructure.
| Object type | MEP System | Object name | Floor 5 Rough-In |
| Technical condition | not filled in |
The networks were identified and their location and extent confirmed.
Main parameters such as dimensions, capacity, and material specifications were verified against design documentation.
| Ductwork Condition | Satisfactory | Plumbing Pressure Test | Fail |
| Electrical Continuity | Pass | Conduit Condition | Satisfactory |
No deviations from the design parameters were found.
The physical condition of the networks was examined through visual inspection and non-destructive testing where applicable.
The networks are in satisfactory condition with no significant deterioration observed.
List defects found in ductwork, piping, conduit, or cables.
| No. | Damage description | Photos |
|---|---|---|
| 1 | - | not filled in |
Provide overall conclusions and recommendations.
| Identification was carried out | Floor 5 - HVAC, plumbing, electrical rough-in |
| There are remarks | Ductwork and piping generally satisfactory. One plumbing joint needs rework. Electrical continuity verified. |
Define abbreviations used in the report.
List the inspector and contractor representatives.
| No. | Full name | Position / status | Comment |
|---|---|---|---|
| 1 | Kevin Brown | MEP Inspector | Performed inspection |
| 2 | Tom Hernandez | Contractor | Present during inspection |
Capture signatures of inspector and contractor.
Report
An engineering networks inspection report documents the inspection of mechanical, electrical, and plumbing (MEP) systems before they are concealed by walls or ceilings. It includes component conditions, test results, defects, observations, and photo evidence.
MEP inspectors, contractors, project managers, and building owners use this report to verify that installed systems meet specifications before closure. It helps prevent costly rework after concealment.
The report includes sections for inspection details, components inspected, test results, defects, observations, photos, and signatures. Each section captures essential data for a complete inspection record.
Before walls and ceilings are closed, MEP systems must be inspected to ensure they are installed correctly. This report documents the inspection and any issues found.
Construction quality control teams use this report to verify that MEP installations meet design specifications and standards. It supports the approval process for subsequent construction phases.
At project completion, the inspection report serves as part of the handover documentation, providing evidence that concealed systems were inspected and approved.
If defects are found during the inspection, this report tracks them until they are resolved. It ensures that all issues are addressed before closure.
Check ductwork for proper routing, supports, and airtightness. Record the condition and any leaks or damage.
Perform pressure tests on plumbing systems to check for leaks. Record test type, result, and measured values.
Verify electrical continuity of conductors and check insulation resistance. Record test results and any faults.
Compile all findings, photos, and signatures into the report. Once approved, the report authorizes the closure of walls and ceilings.
Use the photo report generator to attach photos of ductwork, piping, conduit, and cable trays. Visual evidence is essential for documenting the condition before closure.
Create Photo ReportCapture inspection photos and data on-site with the mobile app. Sync everything to the report template for a seamless workflow from field to office.
Mobile AppClick a section to jump to it in the sample document.
The inspection was conducted in accordance with applicable standards and regulations for engineering network closure.
The object of inspection is the engineering networks scheduled for closure, including their components and associated infrastructure.
Main parameters such as dimensions, capacity, and material specifications were verified against design documentation.
The physical condition of the networks was examined through visual inspection and non-destructive testing where applicable.
List defects found in ductwork, piping, conduit, or cables.
Provide overall conclusions and recommendations.
Define abbreviations used in the report.
List the inspector and contractor representatives.
Capture signatures of inspector and contractor.
It is a document that records the inspection of MEP systems before they are concealed. It includes component conditions, test results, defects, observations, and photos.
The inspection is performed after MEP systems are installed but before walls and ceilings are closed. This is typically during the rough-in phase of construction.
Components include ductwork, piping, conduit, cables, and their supports. The inspection covers mechanical, electrical, and plumbing systems.
Common tests include duct leakage tests, plumbing pressure tests, and electrical continuity tests. The specific tests depend on the systems installed.
The MEP inspector and the contractor representative sign the report. Their signatures confirm that the inspection was completed and the findings are accurate.
Enter inspection details and generate a ready-to-download document.