Energy Storage System Inspection Report
No.ESS-2026-0033
1. General Information
| Inspection date | 7/14/2026 | Address | Battery Storage Facility, 100 Energy Drive, Springfield |
| Basis for inspection | Monthly safety check |
2. Object of Inspection
| Object type | not filled in | Object name | ESS-01 |
| Technical condition | not filled in | Release date | 4/10/2023 |
| Start of operation | 6/1/2023 |
3. System Details
| System Capacity | 20 MWh | Battery Chemistry | LFP |
| Manufacturer | Tesla | Installation Date | 4/10/2023 |
4. Inspection Conditions
5. Defects and Observations
| No. | Damage description | Photos |
|---|---|---|
| 1 | - | not filled in |
| 2 | - | not filled in |
6. Additional Information
| Identification was carried out | System ID: ESS-01, 20 MWh, LFP chemistry |
| There are remarks | Cell voltages within range, cooling system operational. |
7. Inspection Participants
| No. | Full name | Position / status | Comment |
|---|---|---|---|
| 1 | David Wilson | Inspector | Performed inspection |
| 2 | Anna Taylor | Safety Officer | Reviewed safety systems |