Mobile Photo Documentation App
Collect photos and data on-site with the mobile app. Sync your findings directly to the commissioning report template for a seamless workflow.
Mobile AppAct
Formal acceptance of a new elevator installation and its safety systems. Record safety device tests, conclusions, and signatures in a structured online report.
Start with this template
Take photos of the object in the mobile app, complete the inspection report from the template, and download the finished photo report as Word or PDF.
Collect photos and data on-site with the mobile app. Sync your findings directly to the commissioning report template for a seamless workflow.
Mobile AppComplete the document from this template: sections, fields, photo documentation, and signatures.
Use the photo report generator to add visual evidence of the installation and test setups. Capture photos of safety devices, control panels, and overall installation for a complete record.
Create Photo ReportAct
Review the structure, sections, and fields before proceeding to fill out the document.
No.ECR-2026-0037
The general information about the inspection, including the date, location, and purpose, is provided below.
| Inspection date | 7/14/2026 | Address | 1500 Commerce Tower, 500 Main Street, New York, NY 10001 |
| Basis for inspection | New installation acceptance |
The inspection was carried out in full compliance with the established procedures.
The inspected object is an elevator installation, identified by its registration number and location.
| Object type | Passenger Elevator | Object name | Elevator #A |
| Technical condition | not filled in |
The elevator installation was identified and its details were recorded.
The main parameters of the elevator, such as capacity, speed, and travel height, were determined based on the technical passport and nameplate data.
| Manufacturer | Otis | Capacity | 1600 |
| Speed | 2.5 | Number of Stops | 12 |
The main parameters of the elevator correspond to the documented values.
Additional parameters, including control system type, door type, and safety features, were assessed during the inspection.
| Overspeed Governor Test: Pass | Safety Gear Test: Pass |
| Emergency Brake Test: Pass |
The additional parameters were verified and found to be in accordance with the specifications.
The operational conditions of the elevator, including environmental factors and usage patterns, were considered during the inspection.
The elevator is operating under normal conditions as per its design.
Provide acceptance status and any remarks.
| Identification was carried out | Elevator #A, passenger elevator |
| There are remarks | All safety device tests passed. Elevator accepted for service. |
List the commissioning engineer and building owner.
| No. | Full name | Position / status | Comment |
|---|---|---|---|
| 1 | Michael Torres | Commissioning Engineer | Lead commissioning |
| 2 | David Kim | Building Owner | Accepted installation |
Capture signatures of the commissioning engineer and building owner.
Act
An elevator commissioning report documents the formal acceptance of a new elevator installation. It includes identification of the elevator, details of the commissioning process, results of safety system tests, and the final acceptance decision.
Commissioning engineers, building owners, and elevator installers use this report to verify that the elevator meets all safety and performance requirements before it is put into service.
The report includes sections for object identification, commissioning details, safety system tests, conclusions, and signatures. Each section captures essential information for a complete commissioning record.
After a new elevator is installed, a commissioning report is required to formally accept the installation. This template documents all tests and results needed for acceptance.
When an existing elevator is modernized with new components or safety systems, a commissioning report verifies that the updated system operates correctly.
Many jurisdictions require a commissioning report before an elevator can be used. This document provides evidence that the installation meets applicable codes and standards.
The commissioning report serves as a formal handover document from the installer to the building owner. It records the condition and performance of the elevator at the time of acceptance.
Before testing, verify that the elevator installation is complete and all components are properly connected. Check that safety devices are in place and accessible.
Test each safety device individually, including overspeed governor, safety gear, emergency brakes, and door interlocks. Record the result for each device.
Conduct performance tests such as load testing, travel speed, and leveling accuracy. Document the results and any deviations from specifications.
Complete the report with the acceptance status and any remarks. Obtain signatures from the commissioning engineer and building owner to finalize the commissioning.
Use the photo report generator to add visual evidence of the installation and test setups. Capture photos of safety devices, control panels, and overall installation for a complete record.
Create Photo ReportCollect photos and data on-site with the mobile app. Sync your findings directly to the commissioning report template for a seamless workflow.
Mobile AppClick a section to jump to it in the sample document.
The general information about the inspection, including the date, location, and purpose, is provided below.
The inspected object is an elevator installation, identified by its registration number and location.
The main parameters of the elevator, such as capacity, speed, and travel height, were determined based on the technical passport and nameplate data.
Additional parameters, including control system type, door type, and safety features, were assessed during the inspection.
The operational conditions of the elevator, including environmental factors and usage patterns, were considered during the inspection.
Provide acceptance status and any remarks.
List the commissioning engineer and building owner.
Capture signatures of the commissioning engineer and building owner.
An elevator commissioning report is a formal document that records the acceptance of a new elevator installation. It includes details of the elevator, results of safety system tests, and the final acceptance decision.
A commissioning engineer, typically from the elevator manufacturer or a qualified third party, performs the commissioning. The building owner or their representative also participates in the acceptance.
Safety devices tested include the overspeed governor, safety gear, emergency brakes, door interlocks, and any other devices required by the applicable code. Each device is tested for proper operation.
The acceptance status can be 'Accepted', 'Conditionally Accepted', or 'Rejected'. If conditionally accepted, remarks explain the conditions that must be met before full acceptance.
Yes, this template can be adapted for modernization projects where existing elevators are upgraded. It documents the tests and acceptance of the new or modified systems.
Enter inspection details and generate a ready-to-download document.