Drilling Rig Inspection Report
No.DRI-2026-042
1. General Information
| Inspection date | 7/14/2026 | Address | Well Site 7, Permian Basin, TX 79720 |
2. Object of Inspection
| Object name | Rig 12 | Technical condition | not filled in |
3. Equipment & Structural Inspection
| Equipment Component | Drill Pipe | Equipment Condition | Fair |
| Structural Component | Mast Structure | Structural Condition | Fair |
4. Safety Systems Check
| BOP Function Test: Failed | Safety Equipment Status: Operational |
5. Defects Found
| No. | Damage description | Photos |
|---|---|---|
| 1 | - | not filled in |
| 2 | - | not filled in |
| 3 | - | not filled in |
6. Additional Information
| Identification was carried out | Rig identified as Rig 12, asset tag RIG-12-2023 |
| There are remarks | Rig is in fair condition; several minor defects noted that should be addressed before move. |
7. Inspection Participants
| No. | Full name | Position / status | Comment |
|---|---|---|---|
| 1 | Michael Torres | Inspector | Lead inspector |
| 2 | Robert Chen | Contractor Representative | Drilling contractor |
| 3 | Emily Davis | Operator Representative | Well operator |