Mobile Photo Documentation App
Capture photos of defects on-site with the mobile app. Sync data directly to the defect list template for efficient tracking.
Mobile AppRecord
Itemize defects for rectification with this structured defect list template. Record defect location, description, severity, photos, and status to track resolution.
Start creating your defect list now
Take photos of the object in the mobile app, complete the inspection report from the template, and download the finished photo report as Word or PDF.
Capture photos of defects on-site with the mobile app. Sync data directly to the defect list template for efficient tracking.
Mobile AppComplete the document from this template: sections, fields, photo documentation, and signatures.
Use the photo report generator to create defect lists with photos of each defect. It helps document issues clearly for contractors.
Create Photo ReportRecord
Review the structure, sections, and fields before proceeding to fill out the document.
No.DL-2026-007
The general information about the inspection, including the date, location, and purpose, is provided below.
| Inspection date | 7/14/2026 | Address | 88 Construction Site Road, Leeds LS1 2AB |
| Basis for inspection | Stage completion inspection - Phase 2 |
The inspection was carried out in full compliance with the approved schedule and scope.
The building under inspection is identified by its address, purpose, and construction characteristics.
| Object type | Construction Site | Object name | Riverside Apartments |
| Technical condition | not filled in |
The identification data of the building were verified against the technical passport and found to be consistent.
The technical condition of the building structures and elements was evaluated through visual inspection and non-destructive testing methods.
The overall condition of the building is assessed as satisfactory, with no critical defects observed.
List all defects with element, defect type, location, description, and photos.
| No. | Damage description | Photos |
|---|---|---|
| 1 | - | not filled in |
| 2 | - | not filled in |
Provide overall assessment and recommended actions.
| Identification was carried out | Project: Riverside Apartments, Contractor: BuildRight Ltd |
| There are remarks | Total of 12 defects identified, 8 open, 4 resolved. |
List the inspector and contractor.
| No. | Full name | Position / status | Comment |
|---|---|---|---|
| 1 | Kevin White | Site Inspector | Lead inspector |
| 2 | Tom Harris | Project Manager | Contractor representative |
The signatures of the inspection participants confirm the accuracy of the recorded data and the conclusions drawn.
All parties involved have signed the inspection record, indicating their agreement with the findings.
Record
A defect list (also known as a snag list or punch list) is a document that itemizes defects or incomplete work that needs to be rectified. It is commonly used in construction projects to track issues that must be resolved before final acceptance.
This template includes sections for defect list metadata, repeatable defect items with location, description, severity, photos, and status, and signatures. It allows you to track the status of each defect from open to resolved.
Inspectors, site managers, contractors, project owners, and quality assurance professionals can use this template. It is suitable for construction sites, building projects, and maintenance work.
Use this defect list to document issues found during construction inspections. Track defects from identification through rectification to sign-off.
Before handing over a project, create a defect list to record any outstanding issues. The list ensures that all parties agree on what needs to be fixed.
During maintenance audits, use the defect list to record findings that require attention. The status field helps prioritize and track repairs.
Implement quality control processes by documenting defects found during inspections. The list provides a clear record of issues and their resolution.
Use the defect list to evaluate contractor performance by tracking the number and severity of defects. It supports accountability and improvement.
Document defects related to damage or wear for insurance purposes. The list provides evidence of the condition and required repairs.
Receive notification that a construction stage is complete and ready for inspection.
Conduct an inspection of the work and identify any defects or incomplete items.
Record each defect in the list with location, description, severity, and photos. Assign a status (open, in progress, resolved, deferred).
After all defects are resolved, obtain signatures from the inspector and contractor to close out the list.
Use the photo report generator to create defect lists with photos of each defect. It helps document issues clearly for contractors.
Create Photo ReportCapture photos of defects on-site with the mobile app. Sync data directly to the defect list template for efficient tracking.
Mobile AppClick a section to jump to it in the sample document.
The general information about the inspection, including the date, location, and purpose, is provided below.
The building under inspection is identified by its address, purpose, and construction characteristics.
The technical condition of the building structures and elements was evaluated through visual inspection and non-destructive testing methods.
List all defects with element, defect type, location, description, and photos.
Provide overall assessment and recommended actions.
List the inspector and contractor.
The signatures of the inspection participants confirm the accuracy of the recorded data and the conclusions drawn.
A defect list and a punch list are essentially the same thing. Both are used to itemize defects or incomplete work that needs to be rectified before final acceptance. The terms are often used interchangeably in construction.
Yes, each defect item includes a status field with options: open, in progress, resolved, and deferred. You can update the status as work progresses.
Yes, each defect item includes a field for defect photos. You can attach photographs to provide visual evidence of the issue.
The inspector and the contractor typically sign the defect list. The inspector confirms the defects, and the contractor acknowledges them. Signatures are captured in the signatures section.
Yes, the defect items section is repeatable, allowing you to add as many defects as needed. You can organize defects by area or trade for large projects.
Click the 'Use this template' button to open it in the online editor. You can then fill in the project details and add defect items.
Enter inspection details and generate a ready-to-download document.