Mobile Photo Documentation App
Capture cooling tower component photos on-site with the mobile app and seamlessly integrate them into your report for accurate field documentation.
Mobile AppReport
Evaluate the thermal performance and structural integrity of cooling towers with this detailed inspection report template. Record condition of fill, fan, water distribution, and basin components in an online editor.
Start your cooling tower inspection report
Take photos of the object in the mobile app, complete the inspection report from the template, and download the finished photo report as Word or PDF.
Capture cooling tower component photos on-site with the mobile app and seamlessly integrate them into your report for accurate field documentation.
Mobile AppComplete the document from this template: sections, fields, photo documentation, and signatures.
Use the photo report generator to attach fill media photos, fan blade images, and defect close-ups to your cooling tower inspection report.
Create Photo ReportReport
Review the structure, sections, and fields before proceeding to fill out the document.
No.CT-2026-008
The general information about the inspection, including the purpose, scope, and legal basis, is provided below.
| Inspection date | 7/14/2026 | Address | Cooling Tower 2, Riverside Power Plant, 123 Power Plant Rd, Springfield, IL 62701 |
| Basis for inspection | Quarterly inspection |
The inspection was conducted in accordance with the applicable regulations and standards.
The inspected object is a thermal power plant, including its main equipment and auxiliary systems.
| Object type | Cooling Tower | Object name | Cooling Tower 2 |
| Technical condition | not filled in | Release date | 3/15/2010 |
| Start of operation | 5/1/2010 |
The object was identified and its key characteristics are recorded.
The main parameters of the thermal power plant were measured and compared with the design values.
| Water Flow Rate | 4500 | Temperature Drop | 8.5 |
| Approach Temperature | 5.2 | Performance Rating | Satisfactory |
The main parameters are within the permissible ranges specified in the design documentation.
The operating conditions of the plant, including load, temperature, and pressure, were monitored during the inspection.
The operating conditions were stable and within the specified limits.
List defects found in fill, fan, water distribution, drift eliminators, and basin.
| No. | Damage description | Photos |
|---|---|---|
| 1 | - | not filled in |
| 2 | - | not filled in |
Provide overall condition rating, summary of findings, and recommendations.
| Identification was carried out | Cooling Tower 2 |
| There are remarks | Fill media in fair condition, minor blockage in nozzles. Performance satisfactory. |
Record the inspector and plant engineer.
| No. | Full name | Position / status | Comment |
|---|---|---|---|
| 1 | Mark Wilson | Inspector | Performed inspection |
| 2 | Nancy Clark | Plant Engineer | Reviewed findings |
Capture digital signatures of inspector and plant engineer.
Report
A cooling tower inspection report documents the condition and thermal performance of cooling tower components including fill media, fan system, water distribution system, drift eliminators, and cold water basin.
Mechanical engineers, plant engineers, maintenance teams, and cooling tower specialists use this report to assess cooling tower health and plan maintenance activities.
The report includes sections for inspection identification, participants, component inspections (fill, fan, water distribution, drift eliminators, basin), performance assessment, overall assessment, and signatures.
Cooling towers are inspected at regular intervals (monthly, quarterly, annually) to ensure components are in good condition and thermal performance is maintained.
When cooling tower performance degrades, this report helps identify root causes such as fill blockage, fan damage, or water distribution issues.
By tracking component condition over time, asset managers can predict maintenance needs and plan replacements before failures occur.
The performance assessment section records key thermal parameters, supporting energy efficiency evaluations and optimization efforts.
Determine the inspection scope based on operating history and any known issues. Prepare necessary tools for measurements.
Visually inspect fill media, fan blades, water distribution nozzles, drift eliminators, and basin. Note any defects or abnormalities.
Measure water flow rate, temperature drop, ambient wet bulb temperature, and approach temperature to assess thermal performance.
Summarize findings, provide overall condition rating, and list recommendations. Obtain signatures from inspector and plant engineer.
Use the photo report generator to attach fill media photos, fan blade images, and defect close-ups to your cooling tower inspection report.
Create Photo ReportCapture cooling tower component photos on-site with the mobile app and seamlessly integrate them into your report for accurate field documentation.
Mobile AppClick a section to jump to it in the sample document.
The general information about the inspection, including the purpose, scope, and legal basis, is provided below.
The inspected object is a thermal power plant, including its main equipment and auxiliary systems.
The main parameters of the thermal power plant were measured and compared with the design values.
The operating conditions of the plant, including load, temperature, and pressure, were monitored during the inspection.
List defects found in fill, fan, water distribution, drift eliminators, and basin.
Provide overall condition rating, summary of findings, and recommendations.
Record the inspector and plant engineer.
Capture digital signatures of inspector and plant engineer.
The report covers fill media, fan system, water distribution system, drift eliminators, and cold water basin. Each component has its own condition and defect fields.
The performance assessment section records water flow rate, temperature drop, ambient wet bulb temperature, approach temperature, and a performance rating.
Yes, each component section includes defect reference fields with predefined defects such as corrosion, blockage, cracking, and scale buildup.
Photo evidence is required for fill, fan, and water distribution sections. Drift eliminator and basin photos are optional.
The report includes signature fields for the inspector and plant engineer. Both parties confirm the inspection results.
Enter inspection details and generate a ready-to-download document.