The full inspection cycle — in one service

Take photos of the object in the mobile app, complete the inspection report from the template, and download the finished photo report as Word or PDF.

1

Mobile Photo Documentation App

Document the construction site on-the-go with the mobile photo documentation app. Capture images and notes for your report.

Mobile App
2

Inspection report

Complete the document from this template: sections, fields, photo documentation, and signatures.

3

Photo Report Generator

Use the photo report generator to include detailed photographic evidence of construction quality and defects in your expertise report.

Create Photo Report

Report

Document Preview

Review the structure, sections, and fields before proceeding to fill out the document.

Construction Technical Expertise Report

No.CTER-2026-0714

1. General Information

The general information about the inspection, including the date, location, and purpose, is provided below.

Inspection date7/14/2026 AddressRiverside Business Park, Manchester, M1 1AA
Basis for inspectionCourt-ordered expertise for construction dispute
Expert Dr. Anna Kowalski , Structural Engineer

The inspection was conducted under the specified conditions and no procedural irregularities were noted.

2. Object of Inspection

The inspected buildings are identified and their main characteristics are described.

Object nameRiverside Tower Technical conditionnot filled in

The buildings were found to be in a condition consistent with their age and usage.

3. Main Parameters

The main parameters of the buildings, such as dimensions, structural system, and materials, were determined based on design documentation and on-site measurements.

Scope of ExpertiseStructural compliance review of reinforced concrete frame Applicable StandardsEurocode 2, BS 8110

The main parameters correspond to the design values within acceptable tolerances.

4. Inspection Conditions

The overall condition of the buildings was evaluated through visual inspection and non-destructive testing methods.

Inspection conditions are not selected.

The buildings are in a satisfactory condition with no critical defects observed.

5. Inspection Findings

Defects and observations on construction elements.

No.Damage descriptionPhotos
1-not filled in
2-not filled in

6. Additional Information

Technical analysis, conclusions, and recommendations.

Identification was carried outProject: Riverside Tower, Phase 2.
There are remarksSeveral non-compliances with Eurocode 2 identified.

7. Abbreviations and Symbols

List of abbreviations used in the report.

Symbols and abbreviations are not selected

8. Inspection Participants

Expert, client, and contractor involved.

No.Full namePosition / statusComment
1Dr. Anna KowalskiExpert EngineerPhD Structural Engineering
2Mark ThompsonClient RepresentativeProject manager
3John DavisContractor RepresentativeSite manager

Signatures

Signatures of expert and client.

______________________________
Dr. Anna Kowalski, Structural Engineer
______________________________
Dr. Anna Kowalski
______________________________
Mark Thompson
______________________________
John Davis

Report

Purpose and Procedure for Drafting the Document

What is a Construction Technical Expertise Report?

A construction technical expertise report is a comprehensive assessment of construction quality and safety, often required for legal or regulatory purposes. It includes a review of design documents, on-site inspection, and expert analysis.

Who Requests This Report?

Clients, contractors, regulatory authorities, and courts may request this report to resolve disputes, verify compliance, or assess the safety of a construction project.

What Does the Report Include?

The report includes project information, scope of expertise, inspection findings, technical analysis, conclusions, recommendations, and signatures of the expert and client.

Legal Disputes

In construction litigation, this report provides an expert opinion on the quality and safety of the work. It can be used as evidence in court or arbitration.

Regulatory Compliance

Regulatory bodies may require a technical expertise report to verify that a construction project meets building codes and safety standards.

Insurance Claims

Insurance companies may request this report to assess the extent of damage or defects and determine coverage for construction-related claims.

Project Handover

Before final acceptance of a construction project, the client may commission an expertise report to ensure that all work meets the specified requirements.

Quality Assurance

Contractors may use this report as part of their quality assurance process to identify and correct issues before project completion.

  1. 1

    Scope Definition

    Define the scope and objectives of the expertise with the client. Identify the applicable standards and documents to be reviewed.

  2. 2

    Document Review

    Review design drawings, specifications, and other relevant documents to understand the project requirements.

  3. 3

    Site Inspection

    Conduct a thorough on-site inspection of the construction. Examine structural elements, materials, and workmanship.

  4. 4

    Analysis

    Analyze the findings against applicable standards and codes. Identify any non-compliances, defects, or safety concerns.

  5. 5

    Report Preparation

    Compile the analysis into a structured report with conclusions and recommendations. Include photos and test reports as attachments.

  6. 6

    Review and Sign-off

    Review the report with the client and obtain signatures from the expert and client.

Photo Report Generator

Use the photo report generator to include detailed photographic evidence of construction quality and defects in your expertise report.

Create Photo Report

Mobile Photo Documentation App

Document the construction site on-the-go with the mobile photo documentation app. Capture images and notes for your report.

Mobile App

Document Sections

Click a section to jump to it in the sample document.

General Information

The general information about the inspection, including the date, location, and purpose, is provided below.

Object of Inspection

The inspected buildings are identified and their main characteristics are described.

Main Parameters

The main parameters of the buildings, such as dimensions, structural system, and materials, were determined based on design documentation and on-site measurements.

Inspection Conditions

The overall condition of the buildings was evaluated through visual inspection and non-destructive testing methods.

Inspection Findings

Defects and observations on construction elements.

Additional Information

Technical analysis, conclusions, and recommendations.

Abbreviations and Symbols

List of abbreviations used in the report.

Inspection Participants

Expert, client, and contractor involved.

Signatures

Signatures of expert and client.

Document Fields and Columns

General Information

Inspection date
Date of expertise.
Address
Project location.
Basis for inspection
Basis for expertise.
Expert
Expert name.

Object of Inspection

Object name
Name of the building or infrastructure.
Technical condition
Current technical state.

Inspection Findings

No.
Sequential number.
Element
Element inspected.
Defect
Type of defect.
Damage description
Detailed description.
Photos
Photo of defect.

Inspection Participants

No.
Sequential number.
Full name
Name.
Position / status
Role.
Comment
Comment.

Frequently Asked Questions about Photo Reports and Photo Tables

What qualifications should the expert have?

The expert should be a certified structural engineer or a construction specialist with relevant experience. The report includes a section to document the expert's qualifications.

Is this report legally binding?

The report provides an expert opinion and is not legally binding on its own. However, it can be used as evidence in legal proceedings to support a case.

Can this report be used for court purposes?

Yes, the report is designed to meet the requirements of a technical expertise for court. It includes a detailed analysis and conclusions that can be presented as expert testimony.

What standards are referenced in the report?

The report allows you to list applicable standards and codes, such as building codes, Eurocodes, or local regulations. You can customize this based on the project.

How long does it take to prepare this report?

The time depends on the complexity of the project. A typical report may take several days to weeks, including document review, site inspection, and analysis.

Can I add test results to the report?

Yes, the attachments section includes fields for test reports, such as material test results or structural load tests. You can upload them as files.

Create Your Document Online

Enter inspection details and generate a ready-to-download document.