Condition Assessment Report
No.CAR-2026-033
1. General Information
| Inspection date | 7/14/2026 | Address | 1200 Bridge Avenue, Portland, OR 97201 |
| Basis for inspection | Routine condition assessment |
2. Object of Inspection
| Object type | not filled in | Object name | Willamette River Bridge |
| Technical condition | not filled in |
3. Asset Parameters
| Asset Type | Bridge | Year Built | 1975 |
| Total Length | 320 |
4. Inspection Conditions
5. Findings
| No. | Damage description | Photos |
|---|---|---|
| 1 | - 2 | not filled in |
| 2 | - 1.5 | not filled in |
| 3 | - 5 | not filled in |
6. Additional Information
| Identification was carried out | Steel bridge over Willamette River |
| There are remarks | Overall condition fair; corrosion on lower chords needs monitoring. |
7. Inspection Participants
| No. | Full name | Position / status | Comment |
|---|---|---|---|
| 1 | Dr. Alan Reed | Structural Engineer | Lead assessor |
| 2 | Lisa Park | Maintenance Manager | Accompanied inspection |