Mobile Photo Documentation App
Capture CHP component photos on-site using the mobile app and instantly attach them to your inspection act for accurate documentation.
Mobile AppAct
Use this online template to officially record the condition and defects of a central heating point (CHP). Document components, measurements, and photo evidence.
Start your CHP inspection act now
Take photos of the object in the mobile app, complete the inspection report from the template, and download the finished photo report as Word or PDF.
Capture CHP component photos on-site using the mobile app and instantly attach them to your inspection act for accurate documentation.
Mobile AppComplete the document from this template: sections, fields, photo documentation, and signatures.
Use the photo report generator to create a comprehensive CHP inspection act with structured defect data and photo evidence.
Create Photo ReportAct
Review the structure, sections, and fields before proceeding to fill out the document.
No.CHP-IA-2026-0009
The general information about the inspection, including the date, location, and inspection team, is provided below.
| Inspection date | 7/14/2026 | Address | 15 Maple Street, Boiler Room, Boston, MA 02108 |
| Basis for inspection | Annual mandatory inspection per state regulations |
The inspection was carried out in full compliance with the requirements.
The object of inspection is the central heating point, including its equipment, pipelines, and control systems.
| Object type | Building | Object name | 15 Maple Street CHP |
| Technical condition | not filled in | Release date | 6/1/2018 |
| Start of operation | 9/15/2018 |
The central heating point was identified and its boundaries were established.
The main parameters of the central heating point, such as heat output, operating temperatures, and pressures, were measured and compared with design values.
| CHP type | Plate heat exchanger with circulation pump | Rated thermal power | 250 |
| Operating pressure | 6 |
The measured parameters are within the permissible tolerances specified by the design documentation.
Additional parameters, including flow rates, water quality, and energy consumption, were assessed to evaluate the efficiency of the heating point.
| Supply temperature: 75 | Return temperature: 50 |
| Flow rate: 12.5 |
No significant deviations from the expected values were observed.
The operational conditions of the central heating point, including ambient temperature, humidity, and ventilation, were examined.
The conditions are suitable for the safe and reliable operation of the equipment.
List all findings including component, defect, description, location, extent, impact, repair, and photos.
| No. | Damage description | Photos |
|---|---|---|
| 1 | - | not filled in |
| 2 | - | not filled in |
Provide overall condition assessment and recommendations.
| Identification was carried out | CHP ID: CHP-BOS-0042, located in basement of 15 Maple Street |
| There are remarks | Overall condition satisfactory; minor seal leak on circulation pump. |
Record the inspector and building owner details.
| No. | Full name | Position / status | Comment |
|---|---|---|---|
| 1 | Alan Foster | Heating Systems Inspector | Lead inspector |
| 2 | Patricia Wong | Building Owner Representative | Present during inspection |
Capture signatures of the inspector and owner.
Act
A central heating point inspection act is an official document that records the condition, defects, and measurements of a central heating point (CHP). It is used for compliance, maintenance planning, and handover inspections.
Heating system inspectors, building owners, and facility managers use this document to document CHP condition and ensure proper operation.
The act includes inspection metadata, CHP identification, inspected components, defects found, observations, measurements, conclusion, and photo evidence.
Before the heating season, CHP inspections are conducted to ensure the system is ready for operation and identify any defects.
When a CHP is newly installed or transferred to a new owner, an inspection act documents its condition at the time of handover.
Regular inspections help plan preventive maintenance and prioritize repairs based on defect severity.
Some jurisdictions require periodic CHP inspections to comply with energy efficiency or safety regulations.
Gather CHP documentation, identify components to be inspected, and prepare measurement tools.
Visually inspect all components, take measurements (temperature, pressure, flow), and identify any defects. Record findings in the template.
Compile the inspection data, attach photos, and provide an overall condition assessment and recommendations. The inspector and owner sign the act.
Use the photo report generator to create a comprehensive CHP inspection act with structured defect data and photo evidence.
Create Photo ReportCapture CHP component photos on-site using the mobile app and instantly attach them to your inspection act for accurate documentation.
Mobile AppClick a section to jump to it in the sample document.
The general information about the inspection, including the date, location, and inspection team, is provided below.
The object of inspection is the central heating point, including its equipment, pipelines, and control systems.
The main parameters of the central heating point, such as heat output, operating temperatures, and pressures, were measured and compared with design values.
Additional parameters, including flow rates, water quality, and energy consumption, were assessed to evaluate the efficiency of the heating point.
The operational conditions of the central heating point, including ambient temperature, humidity, and ventilation, were examined.
List all findings including component, defect, description, location, extent, impact, repair, and photos.
Provide overall condition assessment and recommendations.
Record the inspector and building owner details.
Capture signatures of the inspector and owner.
Common components include heat exchangers, pumps, valves, control panels, meters, and piping. The template allows you to list any component and assess its condition.
Yes, the act includes a measurements section where you can record parameters such as temperature, pressure, and flow rate with units.
Defects such as leaks, corrosion, cracks, cavitation, bearing wear, pump failure, meter inaccuracy, seal leaks, and fouling can be recorded with severity and location.
The inspector and the building owner or operator sign the act to confirm the findings and acknowledge the results.
Click the 'Use this template' button to open the online editor. You can then enter inspection details, record defects, and generate a professional act.
Enter inspection details and generate a ready-to-download document.