CCTV Survey Report
No.CCTV-2026-0714
1. General Information
| Inspection date | 7/14/2026 | Address | Sewer Line Section A, Oak Avenue, Manchester |
2. Object of Inspection
| Object name | Oak Avenue Sewer Main | Technical condition | not filled in |
3. Pipeline Details
| Pipe Location | Oak Avenue, between MH-12 and MH-14 | Pipe Material | PVC |
| Pipe Diameter | 300 | Pipe Length | 150 |
| Survey Direction | Downstream |
4. Condition Assessment
| No. | Damage description | Photos |
|---|---|---|
| 1 | - 0.3 | not filled in |
| 2 | - 10 | not filled in |
| 3 | - 2 | not filled in |
5. Additional Information
| Identification was carried out | Pipeline identified as PVC DN300, length 150m |
| There are remarks | Overall condition assessed as fair with minor defects. |
6. Inspection Participants
| No. | Full name | Position / status | Comment |
|---|---|---|---|
| 1 | James Carter | CCTV Operator | Operated the CCTV equipment |
| 2 | Sarah Mitchell | Surveyor | Conducted the survey and produced the report |
| 3 | Robert Davies | Asset Manager | Reviewed the survey report |