Boiler Inspection Report
No.BIR-2026-0042
1. General Information
| Inspection date | 7/14/2026 | Address | 1200 Industrial Parkway, Suite 200, Chicago, IL 60607 |
| Basis for inspection | Annual regulatory inspection per ASME Section VII |
2. Object of Inspection
| Object type | not filled in | Object name | Midwest Manufacturing Plant |
| Technical condition | not filled in | Operating Hours, hours | 5000 |
| Release date | 3/15/2018 | Start of operation | 6/1/2018 |
3. Main Parameters
| Boiler Type | Fire-tube | Rated Capacity | 5000 |
| Operating Pressure | 10 | Fuel Type | Natural Gas |
4. Inspection Conditions
5. Findings
| No. | Damage description | Photos |
|---|---|---|
| 1 | - 1 | not filled in |
| 2 | - 1 | not filled in |
6. Additional Information
| Identification was carried out | Boiler ID: BLR-2026-0042 |
| There are remarks | Overall condition satisfactory. Minor scale buildup noted on heat exchanger tubes. |
7. Inspection Participants
| No. | Full name | Position / status | Comment |
|---|---|---|---|
| 1 | James Mitchell | Inspector | Lead inspector |
| 2 | Robert Chen | Facility Engineer | Accompanied inspection |