Air Conditioning Commissioning Report
No.ACC-2026-006
1. General Information
| Inspection date | 7/14/2026 | Address | Tech Park, 100 Innovation Drive, Austin, TX 78701 |
| Basis for inspection | New installation commissioning |
2. Object of Inspection
| System Type | not filled in | System Name | Carrier 30RB Chiller System |
| Technical State | not filled in | Installation Date | 6/1/2026 |
| Commissioning Date | 7/14/2026 |
3. Main Parameters
| Cooling Capacity Test | 350 | Efficiency Measurement | 12.5 |
4. Additional Parameters
| Temperature Differential: 12 | ☐ Refrigerant Charge Check |
5. Inspection Conditions
6. Nonconformities
| No. | Damage description | Photos |
|---|---|---|
| 1 | - 0.5 | not filled in |
7. Additional Information
| Identification was carried out | System ID: AC-2026-001 |
| There are remarks | System commissioned successfully with minor adjustments. |
8. Inspection Participants
| No. | Full name | Position / status | Comment |
|---|---|---|---|
| 1 | Alex Turner | Commissioning Engineer | Lead commissioning engineer |
| 2 | GreenTech HVAC | HVAC Contractor | Installation contractor |
| 3 | Linda Park | Project Manager | Client representative |