Pump Inspection Checklist (Mining)
No.PU-2026-038
1. General Information
| Inspection date | 7/14/2026 | Address | Sump P-04, Level 3, Pine Creek Mine |
2. Object of Inspection
| Object name | P-04 | Technical condition | not filled in |
3. Visual Inspection
| Visual Condition | Fair | Leak Observed | ☐ |
| Corrosion Observed | ☐ | Loose Connections | ☐ |
4. Operational Check
| Operational Status: Operational | ☐ Unusual Noise |
| Flow Rate: 120 |
5. Defects
| No. | Damage description | Photos |
|---|---|---|
| 1 | - | not filled in |
6. Additional Information
| Identification was carried out | Pump ID: P-04, Type: Centrifugal |
| There are remarks | Pump operational. Minor leak at seal. Schedule repair. |
7. Inspection Participants
| No. | Full name | Position / status | Comment |
|---|---|---|---|
| 1 | Kevin Brown | Maintenance Technician | Performed inspection |
| 2 | Steven Adams | Maintenance Manager | Reviewed findings |