Pre-Departure Inspection Checklist
No.PDIC-2026-0714-001
1. General Information
| Inspection date | 7/14/2026 | Address | Port of Liverpool, Berth 5 |
2. Object of Inspection
| Object type | not filled in | Object name | MV Northern Star |
| Technical condition | not filled in |
3. Safety and Systems Checks
| Lifeboat Condition | Satisfactory | Lifeboat Launching Gear | Operational |
| Fire Extinguisher Status | Some Issues | Life Raft Condition | Good |
| Radar Operational | ☐ | Navigation Lights Operational | ☐ |
| GPS Operational | ☐ | Hull Condition | Good |
| Hatch Cover Integrity | ☐ | Mooring Equipment Condition | Good |
| Engine Parameters Normal | ☐ | Generator Status | ☐ |
| Pump Status | ☐ |
4. Deficiencies
| No. | Damage description |
|---|---|
| 1 | - |
| 2 | - |
5. Additional Information
| Identification was carried out | Vessel: MV Northern Star, IMO: 9123456 |
| There are remarks | Vessel ready for departure after addressing minor deficiencies. |
6. Inspection Participants
| No. | Full name | Position / status | Comment |
|---|---|---|---|
| 1 | Mark Wilson | Chief Officer | Conducted the pre-departure inspection |
| 2 | Thomas Green | Engineer | Verified engine room |
| 3 | Captain James Smith | Master | Approved departure |