Electrical Installation Inspection Report (Mining)
No.EIIR-2026-0042
1. General Information
| Inspection date | 7/14/2026 | Address | Main Shaft, North Mine, Sudbury, ON |
2. Object of Inspection
| Object type | not filled in | Object name | ELEC-MN-2024-001 |
| Technical condition | not filled in |
3. Visual Inspection and Testing
| Visual Condition | Fair | Insulation Resistance | 0.8 |
| Grounding Resistance | 2.5 | Continuity Test | Pass |
| RCD Test | Pass |
4. Safety Inspection
| ☐ Safety Guards Present | ☐ Emergency Stops Functional |
| ☐ Lockout/Tagout | ☐ Fire Extinguisher Present |
5. Inspection Conditions
6. Defects
| No. | Damage description | Photos |
|---|---|---|
| 1 | - | not filled in |
| 2 | - | not filled in |
7. Additional Information
| Identification was carried out | Installation ID: ELEC-MN-2024-001 |
| There are remarks | Overall condition is fair. Insulation resistance below minimum in one circuit. Recommend repair. |
8. Inspection Participants
| No. | Full name | Position / status | Comment |
|---|---|---|---|
| 1 | James Carter | Electrical Inspector | Lead inspector |
| 2 | Sarah Mitchell | Electrical Engineer | Reviewing engineer |