Dewatering System Inspection Act
No.DWS-2026-0714
1. General Information
| Inspection date | 7/14/2026 | Address | Level 3, Main Shaft, Kellingley Colliery, Knottingley WF11 8AB |
2. Object of Inspection
| Object type | not filled in | Object name | Dewatering System A |
| Technical condition | not filled in |
3. System Components
| Pump 1 Condition | Good | Pump 2 Condition | Good |
| Pipeline Condition | Fair | Valve Condition | Good |
4. Measurements
| Flow Rate: 150 | Discharge Pressure: 4.2 |
| Pump Runtime: 8760 |
5. Inspection Conditions
6. Defects
| No. | Damage description | Photos |
|---|---|---|
| 1 | - 0.5 | not filled in |
7. Additional Information
| Identification was carried out | System: Dewatering System A |
| There are remarks | Overall status: Satisfactory. Minor leak on pipeline joint repaired on site. |
8. Inspection Participants
| No. | Full name | Position / status | Comment |
|---|---|---|---|
| 1 | Thomas Ward | Inspector | Performed inspection |
| 2 | Gary Smith | Maintenance Technician | Assisted with pump checks |