Blasting Inspection Report
No.BL-2026-042
1. General Information
| Inspection date | 7/14/2026 | Time | 7:00 AM — 8:30 AM |
| Address | Bench 5, East Pit, Pine Creek Mine | Basis for inspection | MSHA Part 56 and company blasting plan |
2. Object of Inspection
| Object name | East Pit Bench 5 |
3. Pre-Blast Checks
| Blast Design Approved | No | Charge Placement Verified | No |
| Stemming Adequate | No | Safety Zone Established | No |
| Warning Signals Checked | No |
4. Blast Monitoring
| Vibration Level: 12.5 | Air Overpressure: 115 |
| ☐ Fly Rock Observed |
5. Inspection Conditions
6. Defects and Observations
| No. | Damage description | Photos |
|---|---|---|
| 1 | - | not filled in |
7. Additional Information
| Identification was carried out | Blast #B-042, Location: East Pit Bench 5 |
| There are remarks | Blast successful. No misfires. Vibration within limits. |
8. Inspection Participants
| No. | Full name | Position / status | Comment |
|---|---|---|---|
| 1 | Michael Evans | Blasting Inspector | Lead inspector |
| 2 | John Miller | Blasting Supervisor | Supervised blast |